Laserfiche WebLink
SECTION 2. DETERMINE APPLICABILITY <br /> Use the criteria below to determine if this template may be used for your project. <br /> 4D <br /> Scenarios for when NOT to use this template include: <br /> A. If any criteria are marked "False,"this template may not be used and a full <br /> stormwater site plan report is required and shall be prepared by a professional <br /> engineer licensed in the State of Washington. <br /> B. If the total lot size/project area is less than 2,000 sf and all criteria are marked <br /> "True,"this template is not required, nor is a full stormwater site plan required. <br /> Only MR#2 is triggered and can be completed by following DCSS Standard Drawing <br /> #103. <br /> True False Criteria <br /> This project will add or replace (in any combination) 2,000 square feet(ftz) but less <br /> ❑ ❑ than 5,000 ftz, of new plus replaced hard surface OR will disturb an area of 7,000 ft2 <br /> or greater. See values in items A and C in Section 1 table. <br /> ❑ ❑ This project does not drain to the combined sewer. <br /> See "Map Everett": www.everettwa.gov/Map erett <br /> ❑ ❑ This project converts less than 3/4 acre of existing soil cover or vegetation to lawn or <br /> landscape areas. Item E in Section 1 table is less than 3/4 acre (or 32,670 ft ). <br /> ❑ This project converts less than 2.5 acres of native vegetation to pasture. <br /> ❑ ❑ This project will not adversely impact a water of the state. <br /> Stormwater runoff after the project is complete will not leave the project site in a <br /> ❑ different location compared to the location it left(discharged) before the project <br /> started. <br /> This project will not be constructed within a critical area or a critical area buffer and <br /> ❑ ❑ will not adversely impact a critical area. See the City of Everett Municipal Code,Title <br /> 19.37. <br /> This project will use the BMPs identified in this template to satisfy MR#5. <br /> ❑ ❑ Note:The use of other BMPs (such as bioretention) or design methods will require a <br /> full stormwater site plan report. <br /> The following flow charts excerpted from Section 1-3.3 of the SWMMWW will help explain which minimum <br /> requirements apply to your project. <br /> City of Everett Public Works <br /> Small Project Stormwater Site Plan/Report—Sept.2023 Page 3 of 40 <br />