My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2102 ROSS AVE 2025-07-28
>
Address Records
>
ROSS AVE
>
2102
>
2102 ROSS AVE 2025-07-28
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/28/2025 11:38:44 AM
Creation date
7/28/2025 11:37:45 AM
Metadata
Fields
Template:
Address Document
Street Name
ROSS AVE
Street Number
2102
Notes
STORMWATER SITE ADDENDUM
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> I <br /> 6. Minimum Requirement#6: Runoff Treatment <br /> Between the Ross Avenue drainage ditch and the outfall into the Snohomish <br /> River, runoff flows through regulated wetlands and as such, enhanced runoff <br /> treatment is required. Pollution generating surfacing will be routed to a DOE <br /> approved Contech Stormwater StormFilter® with Metal Rx media sized to treat <br /> the tributary basin for enhanced treatment. See Appendix C for Western <br /> Washington Hydrologic Modeling (WWHM3) and sizing of the Contech <br /> StormFilter. <br /> The existing 7 cartridge stormfilter manhole northeast of the proposed crane pad <br /> was sized to treat additional runoff from the proposed crane pad. See Section <br /> VIII and Appendix C for additional design information. <br /> 7. Minimum Requirement#7: Flow Control <br /> According to the 2010 City of Everett Stormwater Management Manual and <br /> Appendix I-E from the DOE manual, Flow Control is not required, because the site <br /> discharges into an exempt receiving Water Body. <br /> 8. Minimum Requirement#8: Wetlands Protection <br /> The project site does not discharge into a wetland area. <br /> 9. Minimum Requirement#9: Operations and Maintenance <br /> An Operation and Maintenance Manual is included in Appendix D of this report. <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> Stormwater Site Plan Page 8 <br /> McClean Ironworks Site Improvements August 2014 <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.