Laserfiche WebLink
I <br /> I <br /> V. Source Control Plan <br /> I <br /> The following section details the selection of stormwater control BMPs and facilities that <br /> will serve the proposed project in its developed condition. The selection of stormwater <br /> control and BMP facilities follows the 2010 City of Everett Stormwater Management <br /> Manual and utilizes the activity worksheet shown on the following pages from Chapter 2, <br /> Volume IV. <br /> The following Source Control BMPs from the City of Everett Stormwater Management <br /> Manual, Volume IV, Chapter 2 are suggested: <br /> A2.1 —Loading and Unloading Areas for Liquid or Solid Material <br /> A4.9—Parking and Storage for Vehicles and Equipment <br /> A7.11 —Maintenance of Private Utility Corridors and Facilities <br /> A7.12—Maintenance of Stormwater Drainage and Treatment Facilities <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> t <br /> I <br /> Stormwater Site Plan Page 10 <br /> McClean Ironworks Site Improvements August 2014 <br />