My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2631 WALNUT ST JACKSONS 2025-07-28
>
Address Records
>
WALNUT ST
>
2631
>
JACKSONS
>
2631 WALNUT ST JACKSONS 2025-07-28
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/28/2025 1:58:05 PM
Creation date
7/28/2025 1:55:02 PM
Metadata
Fields
Template:
Address Document
Street Name
WALNUT ST
Street Number
2631
Tenant Name
JACKSONS
Notes
STORMWATER SITE PLAN
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
178
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BMP C140: Dust Control <br /> Purpose Dust control prevents wind transport of dust from disturbed soil surfaces <br /> onto roadways, drainage ways, and surface waters. <br /> Conditions of Use • In areas(including roadways)subject to surface and air movement of <br /> dust where on-site and off-site impacts to roadways, drainage ways, or <br /> ' surface waters are likely. <br /> Design and • Vegetate or mulch areas that will not receive vehicle traffic. In areas <br /> Installation where planting,mulching, or paving is impractical,apply gravel or <br /> Specifications landscaping rock. <br /> • Limit dust generation by clearing only those areas where immediate <br /> ' activity will take place, leaving the remaining area(s)in the original <br /> condition,if stable. Maintain the original ground cover as long as <br /> practical. <br /> ' • Construct natural or artificial windbreaks or windscreens. These may <br /> be designed as enclosures for small dust sources. <br /> ' • Sprinkle the site with water until surface is wet. Repeat as needed. To <br /> prevent carryout of mud onto street, refer to Stabilized Construction <br /> Entrance(BMP C105). <br /> ' a Irrigation water can be used for dust control. Irrigation systems should <br /> be installed as a first step on sites where dust control is a concern. <br /> ' • Spray exposed soil areas with a dust palliative, following the <br /> manufacturer's instructions and cautions regarding handling and <br /> application. Used oil is prohibited from use as a dust suppressants <br /> Local governments may approve other dust palliatives such as calcium <br /> chloride or PAM. <br /> • PAM (BMP C126) added to water at a rate of 0.5 lbs.per 1,000 <br /> ' gallons of water per acre and applied from a water truck is more <br /> effective than water alone. This is due to the increased infiltration of <br /> ' water into the soil and reduced evaporation. In addition, small soil <br /> particles are bonded together and are not as easily transported by wind. <br /> Adding PAM may actually reduce the quantity of water needed for <br /> ' dust control, especially in eastern Washington. Since the wholesale <br /> cost of PAM is about$4.00 per pound,this is an extremely cost- <br /> effective dust control method. <br /> Techniques that can be used for unpaved roads and lots include: <br /> • Lower speed limits. High vehicle speed increases the amount of dust <br /> ' stirred up from unpaved roads and lots. <br /> • Upgrade the road surface strength by improving particle size, shape, <br /> and mineral types that make up the surface and base materials. <br /> 4-40 Volume II—Construction Stormwater Pollution Prevention February 2005 <br />
The URL can be used to link to this page
Your browser does not support the video tag.