My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2631 WALNUT ST JACKSONS 2025-07-28
>
Address Records
>
WALNUT ST
>
2631
>
JACKSONS
>
2631 WALNUT ST JACKSONS 2025-07-28
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/28/2025 1:58:05 PM
Creation date
7/28/2025 1:55:02 PM
Metadata
Fields
Template:
Address Document
Street Name
WALNUT ST
Street Number
2631
Tenant Name
JACKSONS
Notes
STORMWATER SITE PLAN
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
178
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> 4.2 Runoff Conveyance and Treatment BMPs <br /> 1 BMP C200: Interceptor Dike and Swale <br /> Purpose Provide a ridge of compacted soil, or a ridge with an upslope swale, at the <br /> ' top or base of a disturbed slope or along the perimeter of a disturbed <br /> construction area to convey stormwater. Use the dike and/or swale to <br /> intercept the runoff from unprotected areas and direct it to areas where <br /> 1 erosion can be controlled. This can prevent storm runoff from entering the <br /> work area or sediment-laden runoff from leaving the construction site. <br /> Conditions of Use Where the runoff from an exposed site or disturbed slope must be conveyed <br /> 1 to an erosion control facility which can safely convey the stormwater. <br /> • Locate upslope of a construction site to prevent runoff from entering <br /> ' disturbed area. <br /> • When placed horizontally across a disturbed slope,it reduces the <br /> amount and velocity of runoff flowing down the slope. <br /> 1 • Locate downslope to collect runoff from a disturbed area and direct it <br /> to a sediment basin. <br /> ' Design and <br /> Installation • Dike and/or swale and channel must be stabilized with temporary or <br /> permanent vegetation or other channel protection during construction. <br /> Specifications • Channel requires a positive grade for drainage; steeper grades require <br /> 1 channel protection and check dams. <br /> • Review construction for areas where overtopping may occur. <br /> 1 • Can be used at top of new fill before vegetation is established. <br /> • May be used as a permanent diversion channel to carry the runoff. <br /> • Sub-basin tributary area should be one acre or less. <br /> • Design capacity for the peak flow from a 10-year,24-hour storm, <br /> assuming a Type 1A rainfall distribution,for temporary facilities. <br /> Alternatively,use 1.6 times the 10-year, 1-hour flow indicated by an <br /> approved continuous runoff model. For facilities that will also serve <br /> on a permanent basis, consult the local government's drainage <br /> requirements. <br /> Interceptor dikes shall meet the following criteria: <br /> Top Width 2 feet minimum. <br /> Height 1.5 feet minimum on berm. <br /> Side Slope 2:1 or flatter. <br /> ' Grade Depends on topography,however, dike system minimum is <br /> 0.5%,maximum is 1%. <br /> Compaction Minimum of 90 percent ASTM D698 standard proctor. <br /> i <br /> 1 <br /> 111 <br /> February 2005 Volume 11—Construction Stormwater Pollution Prevention 4-57 <br />
The URL can be used to link to this page
Your browser does not support the video tag.