SMP C240: Sediment Trap <br /> Purpose A sediment trap is a small temporary ponding area with a gravel outlet <br /> used to collect and store sediment from sites cleared and/or graded during <br /> construction. Sediment traps, along with other perimeter controls, shall be <br /> installed before any land disturbance takes place in the drainage area. <br /> Conditions of Use Prior to leaving a construction site, stormwater runoff must pass through a <br /> sediment pond or trap or other appropriate sediment removal best <br /> management practice. Non-engineered sediment traps may be used on-site <br /> prior to an engineered sediment trap or sediment pond to provide <br /> ' additional sediment removal capacity. <br /> It is intended for use on sites where the tributary drainage area is less than <br /> ' 3 acres,with no unusual drainage features, and a projected build-out time <br /> of six months or less. The sediment trap is a temporary measure(with a <br /> design life of approximately 6 months) and shall be maintained until the <br /> ' site area is permanently protected against erosion by vegetation and/or <br /> structures. <br /> ' Sediment traps and ponds are only effective in removing sediment down <br /> to about the medium silt size fraction. Runoff with sediment of finer <br /> grades (fine silt and clay)will pass through untreated, emphasizing the <br /> need to control erosion to the maximum extent first. <br /> Whenever possible, sediment-laden water shall be discharged into onsite, <br /> ' relatively level,vegetated areas (see BMP C234--Vegetated Strip). This <br /> is the only way to effectively remove fine particles from runoff unless <br /> chemical treatment or filtration is used. This can be particularly useful <br /> after initial treatment in a sediment trap or pond. The areas of release <br /> must be evaluated on a site-by-site basis in order to determine appropriate <br /> locations for and methods of releasing runoff. Vegetated wetlands shall <br /> ' not be used for this purpose. Frequently, it may be possible to pump water <br /> from the collection point at the downhill end of the site to an upslope <br /> vegetated area. Pumping shall only augment the treatment system,not <br /> replace it,because of the possibility of pump failure or runoff volume in <br /> excess of pump capacity. <br /> All projects that are constructing permanent facilities for runoff quantity <br /> control should use the rough-graded or final-graded permanent facilities <br /> for traps and ponds. This includes combined facilities and infiltration <br /> facilities. When permanent facilities are used as temporary sedimentation <br /> facilities,the surface area requirement of a sediment trap or pond must be <br /> met. If the surface area requirements are larger than the surface area of <br /> the permanent facility,then the trap or pond shall be enlarged to comply <br /> with the surface area requirement. The permanent pond shall also be <br /> divided into two cells as required for sediment ponds. <br /> ' 4402 Volume ll—Construction Stormwater Pollution Prevention February 2005 <br />