Laserfiche WebLink
Stormwater Pollution Prevention Plan <br /> 1 <br /> Appendix C — Alternative BMPs <br /> The following includes a list of possible alternative BMPs for each of the 12 elements not <br /> described in the main SWPPP text. This list can be referenced in the event a BMP for a specific <br /> element is not functioning as designed and an alternative BMP needs to be implemented. <br /> Element#1 - Mark Clearing Limits <br /> 1 <br /> Element#2 - Establish Construction Access <br /> Element#3 -Control Flow Rates <br /> Element#4 -Install Sediment Controls <br /> Advanced BMPs: <br /> Element#5 -Stabilize Soils <br /> 1 <br /> Element#6 - Protect Slopes <br /> 1 <br /> Element#8 -Stabilize Channels and Outlets <br /> 1 <br /> Element#10 -Control Dewatering <br /> Additional Advanced BMPs to Control Dewatering: <br /> I <br /> I <br /> 1 <br /> 1 <br /> 30 16580.006.doc <br />