My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2631 WALNUT ST JACKSONS 2025-07-28
>
Address Records
>
WALNUT ST
>
2631
>
JACKSONS
>
2631 WALNUT ST JACKSONS 2025-07-28
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/28/2025 1:58:05 PM
Creation date
7/28/2025 1:55:02 PM
Metadata
Fields
Template:
Address Document
Street Name
WALNUT ST
Street Number
2631
Tenant Name
JACKSONS
Notes
STORMWATER SITE PLAN
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
178
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> Stormwater Pollution Prevention Plan <br /> Appendix E - Site Inspection Forms (and Site Log) <br /> The results of each inspection shall be summarized in an inspection report or checklist that is <br /> entered into or attached to the site log book. It is suggested that the inspection report or <br /> checklist be included in this appendix to keep monitoring and inspection information in one <br /> document, but this is optional; however, it is mandatory that this SWPPP and the site inspection <br /> forms be kept onsite at all times during construction, and that inspections be performed and <br /> documented as outlined below. <br /> At a minimum, each inspection report or checklist shall include: <br /> a. Inspection date/times <br /> b. Weather information: general conditions during inspection, approximate amount <br /> of precipitation since the last inspection, and approximate amount of precipitation <br /> within the last 24 hours. <br /> c. A summary or list of all BMPs that have been implemented, including <br /> observations of all erosion/sediment control structures or practices. <br /> d. The following shall be noted: <br /> i. locations of BMPs inspected, <br /> ii. locations of BMPs that need maintenance, <br /> iii. the reason maintenance is needed, <br /> iv. locations of BMPs that failed to operate as designed or intended, and <br /> I v. locations where additional or different BMPs are needed, and the reason(s) <br /> why <br /> e. A description of stormwater discharged from the site. The presence of <br /> suspended sediment, turbid water, discoloration, and/or oil sheen shall be noted, <br /> as applicable. <br /> f. A description of any water quality monitoring performed during inspection, and <br /> the results of that monitoring. <br /> g. General comments and notes, including a brief description of any BMP repairs, <br /> maintenance or installations made as a result of the inspection. <br /> h. A statement that, in the judgment of the person conducting the site inspection, <br /> the site is either in compliance or out of compliance with the terms and conditions <br /> of the SWPPP and the NPDES permit. If the site inspection indicates that the <br /> site is out of compliance,the inspection report shall include a summary of the <br /> remedial actions required to bring the site back into compliance, as well as a <br /> rschedule of implementation. <br /> i. Name, title, and signature of person conducting the site inspection; and the <br /> following statement: "I certify under penalty of law that this report is true, <br /> accurate, and complete, to the best of my knowledge and belief". <br /> When the site inspection indicates that the site is not in compliance with any terms and <br /> conditions of the NPDES permit, the Permittee shall take immediate action(s)to: stop, contain, <br /> and clean up the unauthorized discharges, or otherwise stop the noncompliance; correct the <br /> 32 'r 6580.o06.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.