My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2631 WALNUT ST JACKSONS 2025-07-28
>
Address Records
>
WALNUT ST
>
2631
>
JACKSONS
>
2631 WALNUT ST JACKSONS 2025-07-28
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/28/2025 1:58:05 PM
Creation date
7/28/2025 1:55:02 PM
Metadata
Fields
Template:
Address Document
Street Name
WALNUT ST
Street Number
2631
Tenant Name
JACKSONS
Notes
STORMWATER SITE PLAN
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
178
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2.0 MAINTENANCE PROGRAM <br /> ' The following pages contain maintenance needs for most of the components that are part of <br /> your drainage system, as well as for some components that you may not have. You should <br /> plan to complete inspection and/or maintenance for all system components on the following <br /> ' schedule: <br /> General Stormwater Facilities Maintenance Schedule <br /> 1. Monthly from November through April <br /> 2. Once in late summer(preferably September) <br /> 3. After any major storm event <br /> Specific Stormwater Facilities Maintenance Schedule <br /> Oil/Water Separator Manhole: <br /> Two (2)times per year, as well as after all major storm events <br /> Catch Basins: <br /> Two(2)times per year,as well as after all major storm events <br /> Biofilter Cells: <br /> Two (2)times per year, as well as after all major storm events <br /> Please refer to the enclosed maintenance guidelines for specific maintenance requirements <br /> and methods for the above referenced stormwater facilities. <br /> 1 <br /> I <br /> i <br /> I <br /> I <br /> 1 <br /> 16580.005.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.