Laserfiche WebLink
Stormwater Pollution Prevention Plan <br /> 1 <br /> Contents <br /> I 1.0 Introduction 1 <br /> 2.0 Site Description 3 <br /> 2.1 Existing Conditions 3 <br /> I2.2 Proposed Construction Activities 3 <br /> 3.0 Construction Stormwater BMPs 4 <br /> I3.1 The 14 BMP Elements 4 <br /> 3.1.1 Element#1 —Mark Clearing Limits 4 <br /> I 3.1.2 Element#2— Establish Construction Access 4 <br /> 3.1.3 Element#3—Control Flow Rates 5 <br /> 3.1.4 Element#4- Install Sediment Controls 5 <br /> 3.1.5 Element#5—Stabilize Soils 6 <br /> I <br /> 3.1.6 Element#6—Protect Slopes 7 <br /> 3.1.7 Element#7—Protect Drain Inlets 7 <br /> 3.1.8 Element#8-Stabilize Channels and Outlets 8 <br /> I 3.1.9 Element#9—Control Pollutants 8 <br /> 3.1.10 Element#10—Control Dewatering 9 <br /> 3.1.11 Element#11 —Maintain BMPs 10 <br /> I 3.1.12 Element#12—Manage the Project 10 <br /> 3.1.13 Element#13—Construction Stormwater Chemical Treatment 12 <br /> 3.1.14 Element#14—Construction Stormwater Filtration 18 <br /> 3.2 Site Specific BMPs 19 <br /> I 4.0 Construction Phasing and BMP Implementation 20 <br /> 5.0 Pollution Prevention Team 21 <br /> I <br /> 5.1 Roles and Responsibilities 21 <br /> 5.2 Team Members 22 <br /> I6.0 Site Inspections and Monitoring 23 <br /> 6.1 Site Inspection 23 <br /> I 6.1.1 Site Inspection Frequency 23 <br /> 6.1.2 Site Inspection Documentation 23 <br /> 6.2 Stormwater Quality Monitoring 24 <br /> I 6.2.1 Turbidity Sampling 24 <br /> 6.2.2 pH Sampling 25 <br /> 7.0 Reporting and Recordkeeping 26 <br /> I7.1 Recordkeeping 26 <br /> 7.1.1 Site Log Book 26 <br /> I 7.1.2 Records Retention 26 <br /> 7.1.3 Access to Plans and Records 26 <br /> 7.1.4 Updating the SWPPP 26 <br /> 7.2 Reporting 27 <br /> I7.2.1 Discharge Monitoring Reports 27 <br /> 7.2.2 Notification of Noncompliance 27 <br /> I <br /> Iii 16580.006.doc <br />