Laserfiche WebLink
Stormwater Pollution Prevention Plan <br /> 1 M <br /> Section 3— <br /> CONSTRUCTION BMPs. This section provides a detailed <br /> description of the BMPs to be implemented based on the 12 required <br /> elements of the SWPPP (SWMMEW 2004). <br /> • Section 4—CONSTRUCTION PHASING AND BMP IMPLEMENTATION. <br /> This section provides a description of the timing of the BMP <br /> implementation in relation to the project schedule. <br /> 'I . Section 5 — POLLUTION PREVENTION TEAM. This section identifies <br /> the appropriate contact names (emergency and non emergency), <br /> monitoring personnel, and the onsite temporary erosion and <br /> 1 sedimentation control inspector <br /> • <br /> Section 6—INSPECTION AND MONITORING. This section provides a <br /> description of the inspection and monitoring requirements such as the <br /> parameters of concern to be monitored, sample locations, sample <br /> frequencies, and sampling methods for all stormwater discharge locations <br /> from the site. <br /> 1 • Section 7 — RECORDKEEPING. This section describes the requirements <br /> for documentation of the BMP implementation, site inspections, <br /> ' monitoring results, and changes to the implementation of certain BMPs <br /> due to site factors experienced during construction. <br /> Supporting documentation and standard forms are provided in the following Appendices: <br /> Appendix A—Site Plans <br /> Appendix B—Construction BMPs <br /> Appendix C—Alternative BMPs <br /> Appendix D--General Permit <br /> rAppendix E—Site Inspection Forms (and Site Log) <br /> Appendix F—Engineering Calculations <br /> 1 <br /> 1 <br /> i <br /> 1 <br /> 1 <br /> 1 <br /> 1 2 16580.006.doc <br />