My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2631 WALNUT ST JACKSONS 2025-07-28
>
Address Records
>
WALNUT ST
>
2631
>
JACKSONS
>
2631 WALNUT ST JACKSONS 2025-07-28
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/28/2025 1:58:05 PM
Creation date
7/28/2025 1:55:02 PM
Metadata
Fields
Template:
Address Document
Street Name
WALNUT ST
Street Number
2631
Tenant Name
JACKSONS
Notes
STORMWATER SITE PLAN
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
178
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Stormwater Pollution Prevention Plan <br /> duringconstruction to satisfythe requirements set forth in the General NPDES Permit <br /> a <br /> ' (Appendix D). To avoid potential erosion and sediment control issues that may cause a <br /> violation(s) of the NPDES Construction Stormwater permit(as provided in Appendix D), the <br /> Certified Erosion and Sediment Control Lead will promptly initiate the implementation of one or <br /> more of the alternative BMPs listed in Appendix C after the first sign that existing BMPs are <br /> ineffective or failing. <br /> 3.1.11 Element #11 — Maintain BMPs <br /> All temporary and permanent erosion and sediment control BMPs shall be maintained and <br /> repaired as needed to assure continued performance of their intended function. Maintenance <br /> ' and repair shall be conducted in accordance with each particular BMP's specifications. Visual <br /> monitoring of the BMPs will be conducted at least once every calendar week and within 24 <br /> ' hours of any rainfall event that causes a discharge from the site. If the site becomes inactive, <br /> and is temporarily stabilized, the inspection frequency will be reduced to once every month. <br /> All temporary erosion and sediment control BMPs shall be removed within 30 days after the final <br /> site stabilization is achieved or after the temporary BMPs are no longer needed. Trapped <br /> sediment shall be removed or stabilized on site. Disturbed soil resulting from removal of BMPs <br /> or vegetation shall be permanently stabilized. <br /> 3.1.12 Element #12 — Manage the Project <br /> ' Erosion and sediment control BMPs for this project have been designed based on the following <br /> principles: <br /> • Design the project to fit the existing topography, soils, and drainage <br /> patterns. <br /> ' ■ Emphasize erosion control rather than sediment control. <br /> ■ Minimize the extent and duration of the area exposed. <br /> Keep runoff velocities low. • <br /> • Retain sediment on site. <br /> ' ■ Thoroughly monitor site and maintain all ESC measures. <br /> ■ Schedule major earthwork during the dry season. <br /> In addition, project management will incorporate the key components listed below: <br /> As this project site is located west of the Cascade Mountain Crest, the project will be managed <br /> according to the following key project components: <br /> ' Phasing of Construction <br /> • The construction project is being phased to the extent practicable in order <br /> ' to prevent soil erosion, and, to the maximum extent possible, the <br /> transport of sediment from the site during construction. <br /> ' 10 16580.006.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.