My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2631 WALNUT ST JACKSONS 2025-07-28
>
Address Records
>
WALNUT ST
>
2631
>
JACKSONS
>
2631 WALNUT ST JACKSONS 2025-07-28
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/28/2025 1:58:05 PM
Creation date
7/28/2025 1:55:02 PM
Metadata
Fields
Template:
Address Document
Street Name
WALNUT ST
Street Number
2631
Tenant Name
JACKSONS
Notes
STORMWATER SITE PLAN
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
178
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Stormwater Pollution Prevention Plan <br /> The treatment system shall use a minimum of two lined treatment cells. Multiple treatment cells <br /> allow for clarification of treated water while other cells are being filled or emptied. Treatment <br /> cells may be ponds or tanks. Ponds with constructed earthen embankments greater than six <br /> feet high require special engineering analyses. Portable tanks may also be suitable for some <br /> Isites. <br /> The following equipment should be located in an operations shed: <br /> ■ the chemical injector; <br /> • secondary containment for acid, caustic, buffering compound, and <br /> treatment chemical; <br /> ' • emergency shower and eyewash, and <br /> ■ monitoring equipment which consists of a pH meter and a turbidimeter. <br /> Sizing Criteria <br /> The combination of the storage pond or other holding area and treatment capacity should be <br /> large enough to treat stormwater during multiple day storm events. It is recommended that at a <br /> minimum the storage pond or other holding area should be sized to hold 1.5 times the runoff <br /> volume of the 10-year, 24-hour storm event. Bypass should be provided around the chemical <br /> treatment system to accommodate extreme storm events. Runoff volume shall be calculated <br /> using the methods presented in Volume 3, Chapter 2. if no hydrologic analysis is required for <br /> the site, the Rational Method may be used. <br /> Primary settling should be encouraged in the storage pond. A forebay with access for <br /> maintenance may be beneficial. <br /> There are two opposing considerations in sizing the treatment cells. A larger cell is able to treat <br /> a larger volume of water each time a batch is processed. However, the larger the cell the longer <br /> the time required to empty the cell. A larger cell may also be less effective at flocculation and <br /> therefore require a longer settling time. The simplest approach to sizing the treatment cell is to <br /> multiply the allowable discharge flow rate times the desired drawdown time. A 4-hour <br /> drawdown time allows one batch per cell per 8-hour work period, given 1 hour of flocculation <br /> followed by two hours of settling. <br /> The permissible discharge rate governed by potential downstream effect can be used to <br /> ' calculate the recommended size of the treatment cells. The following discharge flow rate limits <br /> shall apply: <br /> ■ If the discharge is directly or indirectly to a stream, the discharge flow rate <br /> shall not exceed 50 percent of the peak flow rate of the 2-year, 24-hour <br /> event for all storm events up to the 10-year, 24-hour event. <br /> 15 16580A06.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.