My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2631 WALNUT ST JACKSONS 2025-07-28
>
Address Records
>
WALNUT ST
>
2631
>
JACKSONS
>
2631 WALNUT ST JACKSONS 2025-07-28
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/28/2025 1:58:05 PM
Creation date
7/28/2025 1:55:02 PM
Metadata
Fields
Template:
Address Document
Street Name
WALNUT ST
Street Number
2631
Tenant Name
JACKSONS
Notes
STORMWATER SITE PLAN
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
178
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Stormwater Pollution Prevention Plan <br /> 1 <br /> 6.2 Stormwater Quality Monitoring <br /> 6.2.1 Turbidity Sampling <br /> ' Monitoring requirements for the proposed project will include either turbidity or water <br /> transparency sampling to monitor site discharges for water quality compliance with the 2005 <br /> Construction Stormwater General Permit (Appendix D). Sampling will be conducted at all <br /> discharge points at least once per calendar week. <br /> Turbidity or transparency monitoring will follow the analytical methodologies described in <br /> Section S4 of the 2005 Construction Stormwater General Permit (Appendix D). The key <br /> benchmark values that require action are 25 NTU for turbidity(equivalent to 32 cm <br /> transparency) and 250 NTU for turbidity (equivalent to 6 cm transparency). If the 25 NTU <br /> ' benchmark for turbidity (equivalent to 32 cm transparency) is exceeded, the following steps will <br /> be conducted: <br /> 1. Ensure all BMPs specified in this SWPPP are installed and functioning as <br /> intended. <br /> ' 2. Assess whether additional BMPs should be implemented, and document <br /> revisions to the SWPPP as necessary. <br /> 3. Sample discharge location daily until the analysis results are less than <br /> 25 NTU (turbidity) or greater than 32 cm (transparency). <br /> If the turbidity is greater than 25 NTU (or transparency is less than 32 cm) but less than <br /> i250 NTU (transparency greater than 6 cm)for more than 3 days, additional treatment BMPs will <br /> be implemented within 24 hours of the third consecutive sample that exceeded the benchmark. <br /> If the 250 NTU benchmark for turbidity (or less than 6 cm transparency) is exceeded at any <br /> time, the following steps will be conducted: <br /> 1. Notify Ecology by phone within 24 hours of analysis (see Section 5.0 of <br /> this SWPPP for contact information). <br /> ' 2. Continue daily sampling until the turbidity is less than 25 NTU (or <br /> transparency is greater than 32 cm). <br /> ' 3. Initiate additional treatment BMPs such as off-site treatment, infiltration, <br /> filtration and chemical treatment within 24 hours of the first 250 NTU <br /> exceedance. <br /> ' 4. Implement additional treatment BMPs as soon as possible, but within <br /> 7 days of the first 250 NTU exceedance. <br /> ' 5. Describe inspection results and remedial actions taken in the site log <br /> book and in monthly discharge monitoring reports as described in Section <br /> 7.0 of this SWPPP. <br /> 24 16580.006.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.