My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2631 WALNUT ST JACKSONS 2025-07-28
>
Address Records
>
WALNUT ST
>
2631
>
JACKSONS
>
2631 WALNUT ST JACKSONS 2025-07-28
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/28/2025 1:58:05 PM
Creation date
7/28/2025 1:55:02 PM
Metadata
Fields
Template:
Address Document
Street Name
WALNUT ST
Street Number
2631
Tenant Name
JACKSONS
Notes
STORMWATER SITE PLAN
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
178
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Stormwater Pollution Prevention Plan <br /> 7.0 Reporting and Recordkeeping <br /> 1 <br /> 7.1 Recordkeeping <br /> 7.1.1 Site Log Book <br /> A site log book will be maintained for all on-site construction activities and will include: <br /> ■ A record of the implementation of the SWPPP and other permit <br /> requirements; <br /> • Site inspections; and, <br /> ■ Stormwater quality monitoring. <br /> For convenience, the inspection form and water quality monitoring forms included in this <br /> SWPPP include the required information for the site logbook. <br /> ' 7.1.2 Records Retention <br /> Records of all monitoring information (site log book, inspection reports/checklists, etc.), this <br /> Stormwater Pollution Prevention Plan, and any other documentation of compliance with permit <br /> requirements will be retained during the life of the construction project and for a minimum of <br /> three years following the termination of permit coverage in accordance with permit condition <br /> S5.C. <br /> 7.1.3 Access to Plans and Records <br /> The SWPPP, General Permit, Notice of Authorization letter, and Site Log Book will be retained <br /> on site or within reasonable access to the site and will be made immediately available upon <br /> request to Ecology or the local jurisdiction. A copy of this SWPPP will be provided to Ecology <br /> within 14 days of receipt of a written request for the SWPPP from Ecology. Any other <br /> information requested by Ecology will be submitted within a reasonable time. A copy of the <br /> SWPPP or access to the SWPPP will be provided to the public when requested in writing in <br /> accordance with Permit Condition S5.G. <br /> 7.1.4 Updating the SWPPP <br /> In accordance with Conditions S3, S4.B, and S9.B.3 of the General Permit, this SWPPP will be <br /> modified if the SWPPP is ineffective in eliminating or significantly minimizing pollutants in <br /> stormwater discharges from the site or there has been a change in design, construction, <br /> operation, or maintenance at the site that has a significant effect on the discharge, or potential <br /> for discharge, of pollutants to the waters of the State. The SWPPP will be modified within seven <br /> days of determination based on inspection(s)that additional or modified BMPs are necessary to <br /> ' correct problems identified, and an updated timeline for BMP implementation will be prepared. <br /> 1 <br /> 26 16580.006.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.