My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2631 WALNUT ST JACKSONS 2025-07-28
>
Address Records
>
WALNUT ST
>
2631
>
JACKSONS
>
2631 WALNUT ST JACKSONS 2025-07-28
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/28/2025 1:58:05 PM
Creation date
7/28/2025 1:55:02 PM
Metadata
Fields
Template:
Address Document
Street Name
WALNUT ST
Street Number
2631
Tenant Name
JACKSONS
Notes
STORMWATER SITE PLAN
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
178
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> 111 • Whenever possible,the entrance shall be constructed on a firm, <br /> compacted subg3rade. This can substantially increase the effectiveness <br /> of the pad and reduce the need for maintenance. <br /> Maintenance • Quarry spalls(or hog fuel) shall be added if the pad is no longer in <br /> Standards accordance with the specifications. <br /> • If the entrance is not preventing sediment from being tracked onto <br /> pavement,then alternative measures to keep the streets free of <br /> sediment shall be used. This may include street sweeping,an increase <br /> in the dimensions of the entrance, or the installation of a wheel wash. <br /> • Any sediment that is tracked onto pavement shall be removed by <br /> shoveling or street sweeping. The sediment collected by sweeping <br /> shall be removed or stabilized on site. The pavement shall not be <br /> cleaned by washing down the street, except when sweeping is <br /> ' ineffective and there is a threat to public safety. If it is necessary to <br /> wash the streets,the construction of a small sump shall be considered. <br /> The sediment would then be washed into the sump where it can be <br /> controlled. <br /> • Any quarry spalls that are loosened from the pad,which end up on the <br /> roadway shall be removed immediately. <br /> • If vehicles are entering or exiting the site at points other than the <br /> construction entrance(s),fencing(see BMPs C103 and C104) shall be <br /> installed to control traffic. <br /> • Upon project completion and site stabilization,all construction <br /> accesses intended as permanent access for maintenance shall be <br /> permanently stabilized. <br /> Driveway shall meet the <br /> requirements of the <br /> permitting agency <br /> It is recommended that <br /> the entrance be <br /> crowned so that runoff <br /> `1° drains°lithe pad <br /> �' •err' ,`�1,� <br /> install driveway culvert \'t`r� <br /> Ii!there is a roadside r�:+•'r�� <br /> ditehpreeent �•,;f + .; <br /> 4'-8'quarry spells .�� •; <br /> Geotextile <br /> bfie' �� <br /> 12"min.thickness._ 4; Ny <br /> ' Provide lull width of <br /> ingress/egress area <br /> 1 <br /> Figure 4.2—Stabilized Construction Entrance <br /> I <br /> ' February 2005 Volume 11—Construction Stormwater Pollution Prevention 4-9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.