Laserfiche WebLink
SECTION IV: CONSTRUCTION STORMWATER POLLUTION <br /> PREVENTION PLAN <br /> Please see sheet C1.0, for the twelve elements and the TESC measures. <br /> SECTION V: SOURCE CONTROL PLAN <br /> On-site BMP's shown on C 1.0 are proposed for source control. There are no stringent <br /> source control requirements for smaller projects. <br /> SECTION VI: SPECIAL REPORTS AND STUDIES <br /> No special reports or studies are required for the project. <br /> SECTION VII: OTHER PERMITS <br /> A right of way permit will be required from City of Everett. <br />