Laserfiche WebLink
i <br /> I0.0376 45 32 71 Pass <br /> 0.0379 43 32 74 Pass <br /> 0.0383 41 32 78 Pass <br /> 0.0386 41 32 78 Pass <br /> 0.0390 40 32 80 Pass <br /> I 0.0393 38 32 84 Pass <br /> 0.0397 37 32 86 Pass <br /> 0.0400 35 31 88 Pass <br /> 0.0404 35 30 85 Pass <br /> 0.0407 34 29 85 Pass <br /> 0.0410 34 28 82 Pass <br /> 0.0414 33 26 78 Pass <br /> These calculations do not include the buffer berm on the west end of the project. Berm adds <br /> additional detention and water quality. <br /> Water Quality BMP Flow and Volume for POC 1. <br /> On-line facility volume: 0.013 acre-feet <br /> On-line facility target flow: 0.01 cfs. <br /> Adjusted for 15 min: 0.0072 cfs. <br /> Off-line facility target flow: 0.0058 cfs. <br /> Adjusted for 15 min: 0.0064 cfs. <br /> Perind and Impind Changes <br /> No changes have been made. <br /> 1 <br /> This program and accompanying documentation is provided'as-is'without warranty of any kind. <br /> IThe entire risk regarding the performance and results of this program is assumed by the user. <br /> Clear Creek Solutions and the Washington State Department of Ecology disclaims all warranties, <br /> either expressed or implied, including but not limited to implied warranties of program and <br /> accompanying documentation. In no event shall Clear Creek Solutions and/or the Washington <br /> State Department of Ecology be liable for any damages whatsoever(including without limitation <br /> to damages for loss of business profits, loss of business information,business interruption, and <br /> the like) arising out of the use of, or inability to use this program even if Clear Creek Solutions <br /> or the Washington State Department of Ecology has been advised of the possibility of such <br /> damages. <br /> 1 <br /> 110062 Serenity Meadows Basin 2B 11 <br /> I <br />