My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10632 7TH AVE SE Geotech Report 2025-07-28
>
Address Records
>
7TH AVE SE
>
10632
>
Geotech Report
>
10632 7TH AVE SE Geotech Report 2025-07-28
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/28/2025 2:58:52 PM
Creation date
7/28/2025 2:57:48 PM
Metadata
Fields
Template:
Address Document
Street Name
7TH AVE SE
Street Number
10632
Address Document Type
Geotech Report
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> June 6,2008 <br /> I Serenity Meadows <br /> L&A Job No. 8A017 <br /> Page 12 <br /> I <br /> FILL section of this report. The remaining trench may be backfilled with on-site soils compacted <br /> Ito a non-yielding state. i <br /> I STRUCTURAL FILL <br /> Structural fill is the fill that support structural or traffic load. Structural fill should consist of <br /> Iclean soils free of organics,debris and other deleterious substances,with particles no larger than <br /> four inches. Structural fill should have a moisture content within one percent of its optimum <br /> moisture content at the time of placement. The optimum moisture content is the water content in <br /> the soils that enables the soils to be compacted to the highest dry density for a given compaction <br /> effort. Clean onsite soils meeting the above requirements may be used as structural filL <br /> I Imported material to be us'i as structural fill, should be clean, free-draining, granular soils <br /> containing no more than 5 percent by weight finer than the No.200 sieve based on the fraction;of <br /> the material passing No. 4 sieve,and with individual particles not larger than four inches. <br /> I Fill embankments placed over areas steeper than 20% grade should be structurally supported. <br /> The ground over which structural fill is to be placed should be prepared in accordance with <br /> I recommendations in the SITE PREPARATION AND GENERAL GRADING and <br /> EXCAVATION <br /> AND FILL SLOPES sections of this report. Structural fill should be placed in <br /> Ilifts no more than 10 inches thick in its loose state, with each lift compacted to a minimum <br /> percentage of the maximum dry density determined by ASTM D1557(Modified Proctor Method) <br /> as follows: <br /> IApplication %of Maximum Dry Density <br /> Within building pads of the building lots 95% <br /> Roadway/driveway subgrade 95%for top 3 feet and 90%below <br /> Retaining wall backfill <br /> 92% <br /> IUtility trench backfill 95% for top 4 feet and 90%below <br /> LIU 4 ASSOCIATES, INC. <br />
The URL can be used to link to this page
Your browser does not support the video tag.