My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10602 16TH AVE SE 2025-07-28
>
Address Records
>
16TH AVE SE
>
10602
>
10602 16TH AVE SE 2025-07-28
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/28/2025 3:59:48 PM
Creation date
7/28/2025 3:58:07 PM
Metadata
Fields
Template:
Address Document
Street Name
16TH AVE SE
Street Number
10602
Notes
DRAINAGE REPORT
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
125
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
8: Stabilize Channels and Outlets <br /> No new channels or outlets are proposed for this site <br /> 9: Control Pollutants <br /> No outside chemicals are expected to be necessary for the construction of this project. All <br /> vehicles working on and around the site would need to meet the State requirements for <br /> emissions. <br /> 10: Control DeWatering <br /> DeWatering may be necessary for this project. However, the detention vault will be <br /> available to aid in metering the release of the runoff while allowing sediment to settle out. <br /> 11: Maintain BMPs <br /> The construction supervisor will be responsible for maintaining all BMPs during <br /> construction and working with the City to relocate or add BMPs as necessary as site <br /> conditions change. BMPs should be inspected and maintained as needed after every rain <br /> event producing more than '/4" of rain in a 24-hour period. Also, BMPs shall be inspected <br /> on a weekly basis even if site work is not occurring. <br /> 12: Manage the Project <br /> It will be the responsibility of the Contractor and Developer to manage this project and <br /> coordinate with the City Inspector and Engineer. <br /> Inspection and Monitoring: <br /> Site inspections shall be done by a person who is knowledgeable in the principles and <br /> practices of erosion and sediment control. The person must have skills to first assess the <br /> site conditions and construction activities that could impact the quality of stormwater, and <br /> second assess the effectiveness of erosion and sediment control measures used to <br /> control the quality of stormwater discharges. <br /> Whenever inspection and/or monitoring reveals that the BMPs identified in the <br /> Construction SWPPP are inadequate, due to the actual discharge of or potential to <br /> discharge a significant amount of any pollutant, appropriate BMPs or design changes shall <br /> be implemented as soon as possible. <br /> Maintaining an Updated Construction SWPPP: <br /> The construction S WPPP shall be retained on-site or within reasonable access to the site. <br /> The SWPPP shall be modified whenever there is a change in the design, construction, <br /> operation, or maintenance at the construction site that has, or could have, a significant <br /> effect on the discharge of pollutants to waters of the state. <br /> The SWPPP shall be modified if, during inspections or investigations conducted by the <br /> owner/operator, or the applicable local or state regulatory authority, it is determined that <br /> the SWPPP is ineffective in eliminating or significantly minimizing pollutants in stormwater <br /> discharges from the site. The SWPPP shall be modified as necessary to include <br /> additional or modified BMPs designed to correct problems identified. Revisions to the <br /> SWPPP shall be completed within seven days following inspection. <br /> Northlake Court Townhomes 13-0609 <br /> May, 2014 Page 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.