Laserfiche WebLink
L) � G � Ga <br />IB.g B.4 <br />9706 4th Avenue NE <br />Suite 300 <br />Seattle, WA 98115 <br />' (2)#5T 12"00" CONC BEAM P:206.523.0024 <br />—X W/ #4 Cn AT 15 " 0. C. F: 206.523.1012 <br />REINF PER PB.g/S6 REINF PER PB.g/S6.1 REINF PER PB.g.6/S6.1 (3)#6B LEVEL 2 LEVEL 2 www.dogengr.com <br />10'-6" 10'-6" h <br />(2)#5V REINF PER PB.g.7/S6.1 (2)N5V EA SIDE <br />OPENING <br />AT WALL END <br />(2)#5V X C. s <br />(2)#5V <br />AT WALL END AT WALL END <br />ov WAsy� j?T <br />LEVEL 1 --y LEVEL 1 �P o <br />------------- 0 -0„ — 0' -0„ <br />- J <br />r 37334 t„ <br />cTURAL SENG�� O <br />---------------------------- S/ <br />STAMP <br />L L L L I I <br />I I <br />L--- ---J <br />Z �• <br />(2)#5H BELOW OPENING a _ <br />PB.4 CONCRETE WALL BEAM ELEVATION W/ 180° HOOKS EA END B. f. CONCRETE WALL BEAM ELEVATION W E <br />v W <br />Z❑m� <br />S6. SCALE 3/16" = 1'-0" S6 SCALE 3/16" = 1'-0" a " <br />vi W <br />N <br />F p o <br />ui z <br />B.g B.4 B.5 B.6 B.7 B.8 <br />(2)#5H ABOVE OPENING <br />EXTEND 4'-0" BEYOND (2)#5V EA �IDE �� c <br />LEVEL 2 LEVEL 2 OPENING OPENING LEVEL 2 <br />10'-6" 10'-6" 10'-6" <br />(2)#5V AT--,,(2)#5V AT <br />(2)#5V WALL END 8A SA WALL END c <br />EA END ggzz <br />d <br />LEVEL 1 ,` LEVEL 1 m <br />0'-0" 0'-0" B.f. <br />r- <br />r-J S6 <br />r J REC 1 PS64 W <br />-------------- ----� �-------------------------------------------- --------------------------------------- ��— _ _ �\ B.4. <br />a <br />S6 <br />B.9. 3 a <br />S6 m o <br />W <br />(13 <br />1 � <br />0 <br />N W <br />❑ <br />W <br />rB4. CONCRETE WALL BEAM ELEVATION B. CONCRETE WALL BEAM ELEVATION B.g. B.g. _ z <br />S6. SCALE 3/16" = 1'-0" S6 SCALE 3/16" = 1'-0" S6 S6 B.4. 42 Z <br />S6 E rcc 4 a <br />L T <br />a)Cj <br />EZ <br />Cg - <br />WALL REINFORCEMENT SCHEDULE Q N LL fn <br />Z MARK WALL VERTICAL HORIZONTAL NOTE L o z <br />O y ujfn <br />0D o <br />B .4 B .4 THICKNESS REINF. REINF. O o <br />8A 8" #5V AT 12" O.C. #5H AT 12" O.C. CENTERED = a <br />W N W® <br />N <br />a <br />LU <br />c0 W Z � a <br />www <br />SB 8„#5V AT 12 O.C. #5H AT 12 O.C. EA FACE O LS J <br />J „ #4H AT 18 0. C. V W a -lie s Q <br />J 8C 8 #5V AT 12 O.C. CENTERED oc a a5 m Z W <br />Q HOOKS NOT REQ D sL o Q C W <br />w WALL TO BE NOTCHED WALL TO BE NOTCHED w Z �? o CD > ww <br />10A 10 #5 V A T 9 O.C. #5H A T 12 O.C. EA FACE <br />FOR BEAM POURED FOR BEAM POURED O o ,0 o m <br />w W/ SLAB LEVEL 2 LEVEL 2 LEVEL 2 W/ SLAB LEVEL 2 OL <br />U - ----------------------------------------------- 10' 6" - 10 6„ 10,-6„ 10'-6" NOTES: <br />Z <br />O <br />Lr7F <br />1. ALL WALL REINFORCING TO MATCH SCHEDULE UNLESS NOTED OTHERWISE. <br />(2)#5V (2)#5V (2)#5V <br />to SA EA END EA END EA END 2. REFER TO DETAIL 9/S8 FOR PLACEMENT OF WALL REINFORCING. <br />m 8B SA <br />C� 3. FTC DOWELS TO MATCH VERTICAL REINF IN SCHEDULE. <br />J I I <br />m 4. PROVIDE REINFORCING LAP LENGTHS PER S1. <br />LEVEL 1 <br />tL' <br />w REC 1 REC 1 ,` REC 1 <br />Z-----------------------------------------------------------------------------------------------------� <br />------------------------------------------------ 2°_6------------------ 2,-6» 2,-6„ <br />--------------------------------- <br />O PROJECT #: 1827 <br />I I <br />U I I <br />DRAWN BY: TF/BV/JH <br />O <br />CHECKED BY: MS/EM <br />U- <br />CONCRETE <br />-j FL--- ---J WALL <br />REINF PER PB.4/S6.1 ELEVATIONS <br />B. CONCRETE WALL BEAM ELEVATION B 4 CONCRETE WALL BEAM ELEVATION B CONCRETE WALL BEAM ELEVATION <br />ui <br />.SCALE 3/16" = 1'-0" S6 SCALE 3/16" = 1'-0" S6 SCALE 3/16" = 1'-0" <br />2 <br />S6ml <br />z <br />W <br />J_ <br />LL <br />