My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9421 18TH AVE W LILYS COURT 2025-07-29
>
Address Records
>
18TH AVE W
>
9421
>
LILYS COURT
>
9421 18TH AVE W LILYS COURT 2025-07-29
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/29/2025 7:30:49 AM
Creation date
7/29/2025 7:21:46 AM
Metadata
Fields
Template:
Address Document
Street Name
18TH AVE W
Street Number
9421
Tenant Name
LILYS COURT
Notes
TECHNICAL INFORMATION REPORT
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
209
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i• <br />• Before You Begin <br /> REQUIRED MATERIALS AND EQUIPMENT LIST end cap holes) <br /> • Acceptable nominal%"—2" (19-51 mm) clean, • OSHA compliance <br /> crushed,angular stone per Tables 4&5 on page 10 • Stone bucket <br />• • Acceptable fill materials per Table 5 on page 10 • Tracked excavator <br /> • Filter fabric • Transit or laser <br /> • StormTech end caps • Vibratory roller with maximum gross vehicle <br /> • StormTech chambers weight of 12,000 lbs (53 kN) and a maximum <br /> • Reciprocating saw or router (to custom cut dynamic force of 20,000 lbs (89 kN) <br />'• Requirements for Svstem installation <br /> StormTech LLC requires installing contractors be installed. Contact StormTech immediately upon <br /> to use and understand StormTech's most current discovery of any damage. <br /> i• installation instructions prior to beginning system Filter fabric must be used as indicated in the <br /> installation. engineer's drawings. <br /> All illustrations and photographs are examples ri To maintain row separation distances and prevent <br /> of typical situations. Actual designs may vary. Be chamber displacement,place stone between chamber <br /> sure to follow the engineer's drawings. rows and around perimeter as required by the most <br /> current version of StormTech's Installation Instructions. <br />• StormTech offers installation consultations to <br /> installing contractors. Contact StormTech at least Backfilling of the chamber system must be <br /> 30 days prior to system installation to arrange a in accordance with the most current version of <br /> pre-installation consultation. Our representatives StormTech's Installation Instructions. <br /> can answer questions, address comments and <br /> provide information about the StormTech chamber 10 The contractor must refer to StormTech's Install- <br />• system's installation requirements. Call 1-888-892- ation Instructions for Tables of Acceptable Vehicle <br /> 2694 or visit www.stormtech.com to receive the Loads at various depths of cover.This information is <br /> most current version of our installation instructions, also available at www.stormtech.com.The contractor <br /> is responsible for preventing vehicles that exceed <br /> ii,a1 Contact local underground utility companies StormTech's requirements from traveling across or <br /> prior to construction, parking over the stormwater system.Temporary fenc- <br />,• ing, warning tape and appropriately located signs <br /> ICJ StormTech's requirements for systems with are commonly used to prevent unauthorized vehi- <br /> a pavement design (asphalt, concrete pavers, Iles from traveling over the stormwater system. <br /> etc.): Minimum cover is 18" (457 mm) not includ- <br /> ing pavement; maximum cover is 96" (2438 mm) ® The contractor must apply erosion and sedi- <br /> including pavement design. For installations that ment control measures to protect the stormwater <br />• do not include pavement, where rutting from vehi- system during all phases of site construction per <br /> Iles may occur, minimum required cover is 24" local codes and design engineer's specifications. <br /> (610 mm), maximum cover is 96' (2438 mm). StormTech products must be designed and <br /> id" The contractor must report any discrepancies installed in accordance with StormTech's minimum <br /> with the system subgrade soil's bearing capacity to requirements as noted in the StormTech Design <br /> the design engineer. Manual. Failure to do so will void the limited warranty. <br /> • <br />• `< A Check chambers for shipping damage prior to StormTech product warranty is limited and can <br /> installation. Units that have been damaged must not be found on the back cover of this manual. <br /> 2 Call StormTech at 666.6922694 for technical and product information or visit www.stormtech.com <br />• 43 <br />
The URL can be used to link to this page
Your browser does not support the video tag.