I. <br /> I• Acceptable Fill Materials <br /> u/ahlc 4—Criteria for Acceptable Nominal 3/4--2" (19-51 mm) Clean, Crushed, Angular Stone <br /> 1 _ <br /> Acceptable Angular Stones have sharp edges and relatively plane sides with unpolished surfaces <br /> I� Subangulai Stones are similar to angular description but have rounded edges <br /> Unacceptable Subrounded Stones have nearly plane sides but have well-rounded corners and edges <br /> Rounded Stones have smoothly curved sides and no edges <br /> NOTE:See®GO of Table 5 for additional angular stone requirements. <br /> Table 5—Acceptable Fill Materials <br /> I. <br /> Material Location Description AASHTO M43 Compaction/Density <br /> Designation' Requirement <br /> U Fill Material for layer D starts from Ally soil/rock materials,native N/A Prepare per engineer's plans.Paved installations <br /> the top of the C layer to the bottom soils or per engineer's plans.Check may have stringent material and preparation <br /> of flexible pavement or unpaved finished plans for pavement subgrade requirements. <br /> grade above.Note that the pavement requirements. <br /> 1410 sub-base may be part of the D layer. <br /> ©Fill Material for layer C starts from Granular well-graded soil/aggregate 3,357,4,467,5, Begin compaction after min.12"(305 mm)of material <br /> the lop of the embedment stone(B layer) mixtures,<35%fines.Most 56,57,6,67,68, over the chambers is reached.Compact additional layers <br /> to 18"(457 mm)above the top of the pavement sub-base materials can 7,78,8,89,9,10 in 6"(152 mm)max.lifts to a min.95%Standard Proctor <br /> chamber.Note that pavement sub-base be used in lieu of this layer. density(see notes).Roller gross vehicle weight <br /> may be part of the C layer. not to exceed 12,000 lbs.(53 kN).Dynamic force not <br /> to exceed 20,000 lbs(89 kN). <br /> 1• <br /> ©Embedment Stone surrounding Clean,crushed,angular stone 3,357,4,467,5, No compaction required. <br /> chambers from the foundation stone nominal particle size distribution 56,57 <br /> to the C layer above. 3/4-2"(19 mm-51 mm) <br /> ®Foundation Stone below the Clean,crushed,angular stone, 3,357,4,467,5, Plate compact or roll to achieve a 95% <br /> chambers from the subgrade up to the nominal size distribution 56,57 Standard Proctor Density.' <br /> foot(bottom)of the chamber. 3/4-2"(19 mm-51 mm) <br /> I. .----- ------. -.._...--- ------ -...--- -- - -- <br /> PLEASE NOTE: <br /> 1. The listed AASHTO designations are for gradations only. The stone must also be clean, crushed, angular. For example, a <br /> specification for#4 stone would state: "clean, crushed, angular no. 4(AASHTO M43)stone." <br /> 2.As an alternate to Proctor Testing and field density measurements on open graded stone, Storm Tech compaction requirements are met <br /> for'A'location materials when placed and compacted in 9"(229 mm)(max.)lifts using two full passes with an appropriate compactor. <br />.11 <br /> MOST PAVEMENT SUBGRADE MATERIALS CAN BE USED IN LIEU OF <br /> Figure 1 —Fill Material Locations REQUIREMENTS FOR LAYERS©& <br /> *TO BOTTOM OF FLEXIBLE PAVEMENT. <br /> • ' FOR UNPAVED INSTALLATIONS WHERE•• 96"(2438 mm) <br /> Once layer C is placed • • • O ' . , , RUTTING FROM VEHICLES MAY OCCUR,, MAX. <br /> any soil/material can • . .IF REQUIRED. ', INCREA_SE COVER TO 24"(610 mm) i <br /> • <br />• be placed in layer D © 18" <br /> (457 mm)MIN. <br /> up to the finished _,F r'g• ;.:1 1 6"(152 mm)MIN. <br /> grade. Most pavement 'r l'ettrite4 ?E <br /> used to replace either -.1 �ni STONE TO BE <br /> y <br /> .S= J\ � A�- ll � TM <br /> E D <br />• design engineer's .ri„-1,�ill- -_---II UIl- _ 1= l I�—_--1 — = -R� : ENGINEERdiscretion. -I IIiEff-fF,-t-i IH11 11=1ii=iii 6"(152 mm)MIN. <br /> AASHTO M288 CLASS 2 NON-WOVEN GEOTEXTILE <br /> ALL AROUND CLEAN,CRUSHED,ANGULAR STONE <br /> 10 Call StormTech at 888.892.2694 for technical and product information or visit www.stormtech.com. <br />. 5/ <br />