Laserfiche WebLink
2 SWPPP ANALYSIS AND DESIGN <br /> Design of the SWPPP Plan was completed in conformance with Volume II of the <br /> Stormwater Manual. Compliance with the 12 elements is summarized below. <br /> Element 1: Preserve Vegetation / Mark Clearing Limits: Clearing limits have been <br /> delineated on sheet ER-01 of the construction plans. The clearing limits extend only <br /> to those areas that will be disturbed during construction of the subject project. The <br /> specific BMPs for marking the clearing limits that will be applied for this project <br /> include: <br /> • Preserving Natural Vegetation (BMP C101) <br /> • Buffer Zones (BMP C102) <br /> • High Visibility Plastic or Metal Fence (BMP C103) <br /> Element 2: Establish Construction Access: The existing gravel driveway will be <br /> utilized for a construction entrance. See sheet ER-01 of the construction plans for <br /> location. A detail is also attached on sheet ER-02 of the construction plans. The <br /> specific BMPs related to establishing construction access that will be used on this <br /> project include: <br /> • Stabilized Construction Entrance (BMP C105) <br /> • Construction Road/Parking Area Stabilization (BMP C107) <br /> Element 3: Control Flow Rates: Increases in flow rates will be mitigated by capturing <br /> and conveying runoff from disturbed areas to a temporary sediment trap prior to <br /> outflowing into the City storm drainage system. Additionally, Post-Construction Soil <br /> Quality and Depth will be implemented for all disturbed soil areas. The specific BMPs <br /> for control of flow rates that shall be used on this project include: <br /> • Temporary Sediment Pond (BMP C241) <br /> • Interceptor Dike and Swale (BMP C200) <br /> July 2014 2-1 LDC Job No. 13-144 <br />