Laserfiche WebLink
1 <br /> IMay 28, 2007 <br /> Proposed Office Building <br /> ' L&A Job No. 7A053 <br /> Page 16 <br /> basins installed in the paved areas. Stormwater thus collected should be tightlined to discharge <br /> into a storm sewer or a suitable stormwater disposal facility <br /> 1 <br /> Building Footing Drains <br /> A subdrain should be installed around the perimeter footings of the proposed office building to <br /> minimize accumulation of groundwater under the building. The subdrain should consist of a 4- <br /> inch-minimum-diameter, perforated, rigid, drain pipe, laid a few inches below the bottom of <br /> perimeter footings. The trench and the drain line should have a sufficient.gradient (0.5% <br /> minimum) to generate flow by gravity. The drain line should be enclosed in washed gravel <br /> completely wrapped in non-woven filter fabric to within about 12 inches of finish grade. The <br /> remaining trenches may be backfilled with on-site impervious soils. Water collected by the <br /> perimeter footing subdrain should be tightlined, separately from the roof and surface stormwater <br /> drain systems,to discharge into a storm sewer or a suitable stormwater disposal facility. <br /> Cleanouts <br /> Sufficient number of cleanouts at strategic locations should be provided for the underground <br /> drain line systems. The underground drain line systems should be maintained periodically to <br /> prevent clogging. <br /> LIMITATIONS <br /> This report has been prepared for the specific application <br /> on to the subject project for the exclusive <br /> use by Builders Investing Group and their clients, associates, consultants and contractors. We <br /> recommend that this re in its entirety, be included in the project contract documents for the <br /> information of the prospective contractors for their estimating and bidding purposes and for <br /> compliance with the recommendations in this report during construction. The conclusions and <br /> interpretations in this report, however, should not be construed as a warranty of the subsurface <br /> LIU & ASSOCIATES, INC. <br /> p <br />