Laserfiche WebLink
I <br /> Stormwater Management Report Everett, WA <br /> I <br /> Project Overview <br /> 1 <br /> Project Location <br /> I P o s s e s s i o n <br /> Sound „P'ra y <br /> ��d lVd Darlington <br /> v <br /> V! <br /> Klt0 9, <br /> N <br /> > r <br /> =�r <br /> aea > Gi co <br /> Mukitteo .t(�ul ' Q 15gg <br /> I 4t1 St h�C' y <br /> 525j <br /> n <br /> I <br /> _ M$sill Creek Pky <br /> Proposed Development �y;1 <br /> 10th St S Merrill Creek <br /> y <br /> I al <br /> rn " Seaway 4'P6 Everett <br /> v2.93 1- <br /> I `') <br /> 525 '�� <br /> I <br /> 4 75th St <br /> S <br /> A 4 <br /> A ON <br /> b 60th St SW <br /> 1> alstPI co <br /> m 5 - 526 <br /> Cornernelsons Paine Field- --__ <br /> Corner szs r- 526 W Casino Rd <br /> Location: East side of 23rd Drive West, Everett, WA in the Seaway Center Business Park, <br /> 1 adjacent to the Northshore Christian Church. The site is situated in the SW Everett/ Paine <br /> Field Subarea Plan and EIS. <br /> ISection/Township/Range: NW 14 Sec. 02, T.28N, R.4E of W.M. <br /> IParcel/Tax Lot: 280402-002-007-00 <br /> Size: 10.66 acres <br /> ICity, County, State: Everett, Snohomish County, Washington <br /> IGoverning Agency: City of Everett <br /> Design Criteria: City of Everett Stormwater Management Manual, January 1997 and 1992 <br /> I <br /> DOE Stormwater Manual. <br /> IPACLAND Job# 50108001 Page 2 <br />