Laserfiche WebLink
I <br /> Stormwater Management Report Everett, WA <br /> INarbeck Creek <br /> 1 The downstream analysis for Narbeck Creek was performed by PACLAND on March 14, <br /> 2008. The weather was overcast with showers and the temperature was approximately 44 <br /> I degrees. <br /> # Photo 1 Description <br /> I , . <br /> }• j <br /> I <br /> Looking north to Lot 3D from the <br /> - ,. NE corner of Lot 3C. <br /> 1 , ` _ ` Runoff currently sheet flows off of <br /> �_ A. _ +- Lot 3C and onto Lot 3D. <br /> -+ '_ , <br /> I <br /> r M ,. `, Li,-.1ili ik• , <br /> ' .. <br /> 1 <br /> I Runoff sheet flows to the small <br /> 2 stormwater pond in the NE corner <br /> *, - of Lot 3D. <br /> ... '7'0If k <br /> Y <br /> 1 , <br /> 'at ,l • <br /> 1 _ ; 18"Inlet with Trashrack <br /> I <br /> I <br /> I <br /> 1 PACLAND Job # 50108001 Page 7 <br />