Laserfiche WebLink
I <br /> Stormwater Management Report Everett, WA <br /> I <br /> Table of Contents <br /> ISection Page <br /> I <br /> Stormwater Drainage Report 2 <br /> I. Project Overview 2 <br /> a. Project Location <br /> I <br /> b. Design Criteria <br /> c. Proposed Drainage System <br /> d. Conclusion <br /> I II. Preliminary Conditions Summary 4 <br /> a. Existing Conditions <br /> b. Discharge at Natural (Existing) Location <br /> I c. Wells, Septic Tanks and Fuel Tanks <br /> d. Existing Topographic Map <br /> e. Existing Drainage Basin Map <br /> I <br /> III. Off-Site Analysis 5 <br /> a. Downstream Analysis <br /> b. Upstream Analysis <br /> I IV. Analysis and Design of Required Erosion and Sediment Control BMPs 10 <br /> a. Construction Sequence and Procedure <br /> b. Soil Stabilization and Sediment Trapping <br /> Ic. Permanent Erosion Control and Site Restoration <br /> d. Inspection Sequence <br /> e. Control of Pollutants Other Than Sediments <br /> I f. Utilities <br /> g. TESC Plan <br /> V. Analysis and Design of Required Runoff Control BMPs 13 <br /> 1 VI. Special Reports and Studies <br /> a. Preliminary Geotechnical Report <br /> b. Clarification of Recommended Building Setbacks <br /> I, VII. Other Permits <br /> VIII. Miscellaneous Forms and Worksheets <br /> IX. Maintenance and Operation Requirements <br /> I <br /> 1 <br /> 1 <br /> 1 <br /> IPACLAND Job# 50108001 Page 1 <br />