My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5901 23RD DR W SEAWAY CORP 3C 2025-07-29
>
Address Records
>
23RD DR W
>
5901
>
SEAWAY CORP 3C
>
5901 23RD DR W SEAWAY CORP 3C 2025-07-29
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/29/2025 11:12:19 AM
Creation date
7/29/2025 11:12:18 AM
Metadata
Fields
Template:
Address Document
Street Name
23RD DR W
Street Number
5901
Tenant Name
SEAWAY CORP 3C
Notes
STORM DRAINAGE ANALYSIS
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
141
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> Stormwater Management Report Everett, WA <br /> Off-site conveyance calculation: <br /> 11 For the offsite portion of the drainage system, a backwater analysis was performed. This <br /> confirms that the drainage system has capacity if the Lot 3D development connects to any <br /> catch basin in the system. <br /> The conveyance system for off-site conveyance system was analyzed using the 1998 King <br /> County Backwater (KCBW) hydraulic design and StormSHED SCS Method for hydrologic <br /> design. Adequate capacity to convey peak rate runoff and adherence to all applicable <br /> system composition requirements per City of Everett Standards are incorporated within the <br /> design. See the following KCBW analysis program printout sheets for results of the <br /> backwater analysis. This section demonstrates compliance with an analysis of conveyance <br /> capacity for the storm drainage network. <br /> Storm drainage capacity analysis is based on the following assumptions: <br /> • The undetained 100-year discharge from both Lot 3C and 3D of 5.18 cfs was used <br /> for the backwater analysis. <br /> • The design 100-year water surface of the proposed detention (elev. = 420.6) was <br /> used as the tailwater elevation for this analysis. <br /> REVIEW OF THE PIPE-DATA <br /> PI OUTLET INLET IN OVERFLO END STRU Q <br /> # LENGTH DI TY ELEV ELEV TY ICE K M C Y ELEV ANG WIDE RAT <br /> I/ <br /> 1 30.00 18 1 414.50 417.25 6 .20 .0078 2.0 .0292 .74 422.25 87 2.0 0.00 <br /> 2 263.00 18 1 417.25 420.00 6 .20 .0078 2.0 .0292 .74 423.70 87 2.0 0 .00 <br /> 3 74.00 18 1 420.00 421.00 6 .20 .0078 2.0 .0292 .74 425.00 45 2.0 0.00 <br /> 4 135.00 12 1 421.50 426.00 6 .20 .0078 2.0 .0292 .74 430.00 5 2.0 0.00 <br /> 5 130.00 12 1 426.00 431.00 6 .20 .0078 2.0 .0292 .74 436.00 45 2.0 0.00 <br /> 6 142.00 12 1 431.00 433.00 6 .20 .0078 2.0 .0292 .74 438.00 15 2.0 0.00 <br /> 7 107.00 12 1 433.00 435.00 6 . 20 .0078 2.0 .0292 .74 <br /> BACKWATER COMPUTER PROGRAM FOR PIPES <br /> Pipe data from file:runl.bwp <br /> Surcharge condition at intermediate junctions <br /> Tailwater Elevation:420. 6 feet <br /> Discharge Range: l. to 6. Step of 0.5 [cfs] <br /> Overflow Elevation: 444 . feet <br /> Weir:NONE <br /> Upstream Velocity:3. feet/sec <br /> PIPE NO. 1: 30 LF - 18"CP @ 9. 17% OUTLET: 414 .50 INLET: 417.25 INTYP: 6 <br /> JUNC NO. 1: OVERFLOW-EL: 422.25 BEND: 87 DEG DIA/WIDTH: 2 .0 Q-RATIO: 0.00 <br /> Q(CFS) HW(FT) HW ELEV. * N-FAC DC DN TW DO DE HWO HWI <br /> 1.00 3.37 420. 62 * 0.012 0.38 0. 18 6. 10 6. 10 3.36 3. 37 0.44 <br /> 1.50 3.37 420. 62 * 0.012 0. 46 0.22 6. 10 6. 10 3.36 3. 37 0.57 <br /> 2.00 3.39 420. 64 * 0.012 0.54 0.25 6. 10 6. 10 3. 36 3. 39 0. 68 <br /> PACLAND Job# 50108001 Page 20 <br />
The URL can be used to link to this page
Your browser does not support the video tag.