My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5901 23RD DR W SEAWAY CORP 3C 2025-07-29
>
Address Records
>
23RD DR W
>
5901
>
SEAWAY CORP 3C
>
5901 23RD DR W SEAWAY CORP 3C 2025-07-29
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/29/2025 11:12:19 AM
Creation date
7/29/2025 11:12:18 AM
Metadata
Fields
Template:
Address Document
Street Name
23RD DR W
Street Number
5901
Tenant Name
SEAWAY CORP 3C
Notes
STORM DRAINAGE ANALYSIS
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
141
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> I <br /> Narbeck Creek Drainage Detention Basin Design <br /> I <br /> Lot 3D is currently located on a ridge line, with approximately half of its area draining towards <br /> 111 the east into Narbeck Creek and half towards the west into Powder Mill Gulch. The project <br /> proposes to maintain the same overall drainage pattern for the area,while flattening out the ridge <br /> for recreational uses. To maintain that drainage pattern,the lot will have a crest from south to <br /> north, with slopes to the east and west. The discharge to the west will be routed to the proposed <br /> R/D pond in the northwest corner of the project area, which has been sized to account for this <br /> II area's drainage. The drainage to the east will be to another proposed pond in the northeast <br /> corner of the project area that will discharge into Narbeck Creek. <br /> The contributing area of Lot 3D to the Narbeck Creek drainage basin prior to development is <br /> approximately four acres. To ensure the overall drainage pattern of the area remains the same, <br /> 111 the developed portion of Lot 3D that contributes to the Narbeck Creek drainage will also be four <br /> acres,as demonstrated in Figure 1. The drainage will be sloped to the north and discharge into <br /> the proposed Narbeck Creek detention pond. Attached are the data used to develop the storm <br /> 1111. water runoff model of the Narbeck Creek drainage basin,as well as the stage/storage data for the <br /> proposed Narbeck Creek detention basin and the flow control structure characteristics. Figures 2 <br /> and 3 show the flow paths and T0's for the existing and developed conditions, respectively. <br /> The Narbeck Creek detention and is four feet deep(inclu <br /> ding( dmg one foot of freeboard), has <br /> trapezoidal geometry,side slopes of 3H:1 V,and a foot print of 44' x 104'. Because there will be <br /> 0 no impervious area in the drainage basin after development,neither a percent impervious volume <br /> correction factor nor additional volume for water quality treatment are required. Hence, the pond <br /> was sized using only detained volume (7,481 cf)generated by the 100 year storm event over the <br /> IIentire Norbeck Creek drainage basin and no additional pond volume was provided. <br /> Discharge from the pond is through a flow control structure at 50%of the two year pre- <br /> developed, 100%of the 10 year pre-developed, and 100%of the 100 year pre-developed peak <br /> II discharges. From the flow control structure,the discharge passes through another catch basin <br /> and into Narbeck Creek. The second catch basin is to collect storm water from future <br /> development to the south in the Narbeck Creek drainage basin. A gabion type flow dissipator is <br /> I_ designed for the discharge into Narbeck Creek. The flow dissipator will be placed at the bottom <br /> of the conveyance system from the pond,prior to discharge to Narbeck Creek. <br /> lI <br /> Orifice Release to Powder Mill Gulch and Stub <br /> The overflow riser diameter is specified in the plans as 18", not 12"as described in the drainage <br /> report. Splitting the 100 year developed peak discharge of 10.6 cfs between the two risers leads <br /> to 5.3 cfs in each. From Figure 1-5.16 of the COE Stormwater Management Manual, an 18" <br /> riser passing 5.3 cfs will only require 0.5 ft of head,which still leaves an additional 0.5ft of <br /> freeboard. Table I presents the total discharge from the project site, and Tables 2 and 3 <br /> demonstrate the 74%and 26%flow splitting of the total discharge to the Powder Mill Gulch <br /> system and the 18"storm sewer stub, respectively. <br /> I <br /> C:1My Documents\Northshore(97-070)Worthshore supplemental.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.