Laserfiche WebLink
I <br /> 1 <br /> II 0.0545 5 4 80 Pass <br /> 0.0550 5 4 80 Pass <br /> 0.0555 5 3 60 Pass <br /> 0.0561 4 3 75 Pass <br /> II 0.0566 3 3 100 Pass <br /> 0.0571 3 3 100 Pass <br /> 0.0577 3 3 100 Pass <br /> 0.0582 3 3 100 Pass <br /> U <br /> 0.0587 0.0593 2 3 150 Fail <br /> 2 2 100 Pass <br /> 0.0598 2 2 100 Pass <br /> 0.0603 2 2 100 Pass <br /> I 0.0609 2 2 100 Pass <br /> 0.0614 2 2 100 Pass <br /> 0.0620 2 2 100 Pass <br /> 0.0625 2 2 100 Pass <br /> I <br /> 0.0630 2 2 100 Pass <br /> 0.0636 2 2 100 Pass <br /> 0.0641 2 2 100 Pass <br /> I 0.0646 2 2 100 Pass <br /> 0.0652 2 2 100 Pass <br /> 0.0657 2 2 100 Pass <br /> 0.0662 2 2 100 Pass <br /> II 0.0668 2 2 100 Pass <br /> 0.0673 2 2 100 Pass <br /> 0.0678 2 2 100 Pass <br /> 0.0684 2 2 100 Pass <br /> II0.0689 2 2 100 Pass <br /> The development has an increase in flow durations <br /> I from 1/2 predeveloped 2 year flow to the 2 year flow <br /> or more than a 10% increase from the 2 year to the 50 <br /> year flow. <br /> I Water Quality BMP Flow and Volume for POC 3. <br /> On-line facility volume: 0.011 acre-feet <br /> On-line facility target flow: 0.01 cfs. <br /> Adjusted for 15 min: 0.0233 cfs. <br /> I Off-line facility target flow: 0.0089 cfs. <br /> Adjusted for 15 min: 0.0101 cfs. <br /> Flow Frequency Return Periods for Predeveloped. POC #4 <br /> 1 Return Period 2 year Flow(cfs) <br /> 0.023209 <br /> 5 year 0.031077 <br /> 10 year 0.036668 <br /> I 25 year 0.044181 <br /> 50 year 0.050112 <br /> 100 year 0.056337 <br /> II Flow Frequency Return Periods for Mitigated. POC #4 <br /> Return Period Flow(cfs) • <br /> 2 year 0.021516 <br /> II 5 year 0.029378 <br /> 10 year 0.035049 <br /> 25 year 0.04276 <br /> 50 year 0.04891 <br /> II <br /> 1 <br />