Laserfiche WebLink
II <br /> I <br /> 0.1500 5 4 80 Pass <br /> 0.1515 5 4 80 Pass <br /> 0.1529 4 3 75 Pass <br /> 0.1544 3 3 100 Pass <br /> I <br /> 0.1558 3 3 100 Pass <br /> 0.1573 3 3 100 Pass <br /> 0.1587 3 3 100 Pass <br /> 0.1602 2 2 100 Pass <br /> I <br /> 0.1617 2 2 100 Pass <br /> 0.1631 2 2 100 Pass <br /> 0.1646 2 2 100 Pass <br /> 0.1660 2 2 100 Pass <br /> I <br /> 0.1675 2 2 100 Pass <br /> 0.1690 2 2 100 Pass <br /> 0.1704 2 2 100 Pass <br /> 0.1719 2 2 100 Pass <br /> II <br /> 0.1733 2 2 100 Pass <br /> 0.1748 2 2 100 Pass <br /> 0.1763 2 2 100 Pass <br /> I 0.1777 2 2 100 Pass <br /> 0.1792 2 2 100 Pass <br /> 0.1806 2 2 100 Pass <br /> 0.1821 2 2 100 Pass <br /> I <br /> 0.1835 2 2 100 Pass <br /> 0.1850 2 2 100 Pass <br /> 0.1865 2 2 100 Pass <br /> 0.1879 2 2 100 Pass <br /> IThe development has an increase in flow durations <br /> from 1/2 predeveloped 2 year flow to the 2 year flow <br /> I or more than a 10% increase from the 2 year to the 50 <br /> year flow. <br /> Water Quality BMP Flow and Volume for POC 5. <br /> I On-line facility volume: 0.0301 acre-feet <br /> On-line facility target flow: 0.01 cfs. <br /> Adjusted for 15 min: 0.0481 cfs. <br /> Off-line facility target flow: 0.0244 cfs. <br /> Adjusted for 15 min: 0.0276 cfs. <br /> II <br /> Flow Frequency Return Periods for Predeveloped. POC #6 <br /> Return Period Flow(cfs) <br /> II <br /> 2 year 5 year 0.133449 <br /> 0.178692 <br /> 10 year 0.210842 <br /> 25 year 0.254042 <br /> I 50 year 0.288146 <br /> 100 year 0.323935 <br /> Flow Frequency Return Periods for Mitigated. POC #6 <br /> II Return Period Flow(cfs) <br /> 2 year 0.129531 <br /> 5 year 0.175476 <br /> II 10 year 0.207728 <br /> 25 year 0.250613 <br /> 50 year 0.284137 <br /> 100 year 0.319036 <br /> 1 <br /> II . <br />