Laserfiche WebLink
I . <br /> II <br /> I 0.2019 5 4 80 Pass <br /> 0.2039 4 4 100 Pass <br /> 0.2058 3 3 100 Pass <br /> 0.2078 3 3 100 Pass <br /> I <br /> 0.2097 3 3 100 Pass <br /> 0.2117 3 2 66 Pass <br /> 0.2136 2 2 100 Pass <br /> 0.2156 2 2 100 Pass <br /> I <br /> 0.2175 2 2 100 Pass <br /> 0.2194 2 2 100 Pass <br /> 0.2214 2 2 100 Pass <br /> 0.2233 2 2 100 Pass <br /> I <br /> 0.2253 2 2 100 Pass <br /> 0.2272 2 2 100 Pass <br /> 0.2292 2 2 100 Pass <br /> 0.2311 2 2 100 Pass <br /> II <br /> 0.2331 2 2 100 Pass <br /> 0.2350 2 2 100 Pass <br /> 0.2369 2 2 100 Pass <br /> I <br /> 0.2389 2 2 100 Pass <br /> 0.2408 2 2 100 Pass <br /> 0.2428 2 2 100 Pass <br /> 0.2447 2 2 100 Pass <br /> I <br /> 0.2467 2 2 100 Pass <br /> 0.2486 2 2 100 Pass <br /> 0.2506 2 2 100 Pass <br /> IThe development has an increase in flow durations <br /> from 1/2 predeveloped 2 year flow to the 2 year flow <br /> or more than a 10% increase from the 2 year to the 50 <br /> Iyear flow. <br /> Water Quality MP Flow and Volume for POC 7. <br /> On-line facility volume: 0.0402 acre-feet <br /> I On-line facility target flow: 0.01 cfs. <br /> Adjusted for 15 min: 0.0641 cfs. <br /> Off-line facility target flow: 0.0325 cfs. <br /> Adjusted for 15 min: 0.0368 cfs. <br /> I <br /> Flow Frequency Return Periods for Predeveloped. POC #8 <br /> Return Period Flow(cfs) <br /> 2 year 0.058021 <br /> I <br /> 5 year 0.077692 <br /> 10 year 0.091671 <br /> 25 year 0.110453 <br /> 50 year 0.125281 <br /> I100 year 0.140842 <br /> Flow Frequency Return Periods for Mitigated. POC #8 <br /> Return Period Flow(cfs) <br /> II 2 year 0.055989 <br /> 5 year 0.075974 <br /> 10 year 0.09002 <br /> I <br /> 25 year 0.108715 <br /> 50 year 0.123342 <br /> 100 year 0.138578 <br /> 1 <br /> 1 <br />