Laserfiche WebLink
1 <br /> 1 • <br /> Proposed James Monroe Elementary Subsurface Exploration, Geologic Hazards, and School Replacement Revised Geotechnical Engineering Report <br /> Everett, Washington Design Recommendations <br /> 1 We are also available to provide geotechnical engineering and monitoring services during <br /> construction. The integrity of the foundation system depends on proper site preparation and <br /> construction procedures. In addition, engineering decisions may have to be made in the field <br /> in the event that variations in subsurface conditions become apparent. Construction monitoring <br /> services are not part of our currently approved scope of work. <br /> I <br /> We have enjoyed working with you on this study and are confident that these recommendations <br /> will aid in the successful completion of your project. If you should have any questions or <br /> 1 require further assistance, please do not hesitate to call. <br /> Sincerely, <br /> 1 ASSOCIATED EARTH SCIENCES, INC. <br /> Kirkland, Washington <br /> a,WAR/ <br /> , <br /> t is x <br /> �� (�1�� r <br /> tO 23580O <br /> .SS orvA1-� �` `. <br /> .#07 <br /> Srtice duenzier, P.E.G. Kurt D. Merriman, P.E. <br /> 1 Project Geologist Principal Engineer <br /> 1 Attachments: Figure l: Site and Exploration Plan <br /> Appendix: Exploration Logs <br /> Laboratory Testing Results <br /> • <br /> 1 <br /> i <br /> i <br /> 1 <br /> 1 October 5, 2009 ASSOCIATED EARTH SCIENCES,INC. <br /> 6WC11d-KE090312A3-Projects{200903121KEIWP Page 20 <br /> 1 <br />