Laserfiche WebLink
Intermec/Kenilworth Hills Stormwater Analysis Everett, WA <br /> 111 <br /> Downstream Analysis <br /> IA downstream analysis was performed on May 29, 2009. The temperature was approximately <br /> 75 degrees under clear skies. <br /> I NW <br /> ' i ,.Edgewater.: t�M $, fi <br /> Park-� , ,j?1 �;t 4 - i <br /> Ntukilteo 0° + P .. -R 'A '' b <br /> t,� a Edgewater � •Itt �: <br /> +� �s ".,,, . ' Creek a 110'.. <br /> ik <br /> J ;ht..t, `°. k� a ,� Downstream t' 1;�t.- <br /> ire_n af •`r analysis path rim erg <br /> A <br /> End of Downstreamy , k 4 'P'.' '' <br /> Analysis at Confluence < $' +• <br /> with Interair {.4f. �' , ` -- ro <br /> Downstream Analysis r- '4. s Existing <br /> 1 � _ �'" � ,,, Kenilworth <br /> ti ,. Hills #1 Pond <br /> I <br /> i .«_,/,,,;:-; <br /> :, ► - `" m <br /> ' 5t61h S <br /> Interair <br /> SiteI <br /> 4� 4'or..1— 44"gY <br /> r may, <br /> • - r w <br /> 4. �;i IeJte l+��.a <br /> Existing <br /> Intermec Pond 1 ' al= '1„;',I ile., <br /> A = �' Intermec <br /> : � e Lot 1 <br /> I '. - . <br /> Figure 1 — Downstream Analysis Path <br /> I <br /> I <br /> IPACT AND Job# 50175001 Page 3 <br />