|
CODE AND LIFE SAFETY DATA VICINITY MAP ARCHITECTURAL
<br /> PROJECT INFORMATION 5019 Evergreen Way, SHEET REVISIONS B A N K O F A M E R I C A
<br /> Everett,WA 98203 NUMBER SHEET NAME LATEST DATE DESCRIPTION
<br /> COVERSHEET
<br /> Project Name: EVERGREEN AND 50TH ; A00.00 DRAW ING INDEX,PROJECT INFORMATION AND GENERAL
<br /> NOTES EXTERIOR RENOVATION
<br /> Project Address: Ever Evergreen Way, `""""'"• A00.60 SITE PLAN
<br /> Proposed Use/ Everett,WA 98203 0 ;•mFl� 0 A09.00 EXTERIOR ELEVATIONS 5019 Evergreen Way,
<br /> ,
<br /> Occupancy: NO CHANGE;BUSINESS(B) 0 F'Po" A09.30 EXTERIOR DETAILS Everett,WA 98203
<br /> Owner/Autorized Agent:CHRIS GEER Email:ceRis.eeeaBcusewace.com Phone:360.322.2914 °i 0B1o"'^"•'""`^"^' BUILDING ID:WA4_142
<br /> V n
<br /> Proptery Owned by: ❑City/County ❑Private ❑State 0 a" p 0 kdm" .„ ,
<br /> Code Enforcement Jurisdiction:❑City EVERETT ❑County SNOHOMISH ❑State WA
<br /> 99
<br /> BASIC BUILDING DATA SUMMARY "• "�®""© ©° O�
<br /> Construction Type: ❑I-A ❑ ❑III-A ❑IV V-A II-A ❑ °o1pe10 m®�"PmeOfnip1
<br /> ElI-B ElII-B ElIII-B �.,"�.©°"�„ o o ��" Gensler
<br /> Sprinklers:(Chapter 9)❑No❑Partial ❑Yes El NFPA 13 El NFPA 13R El NFPA 13D "
<br /> 1200 Sixth Avenue Tel 206,654,2100
<br /> Building Height:(Stories) 1 "'""""0 Suite 500 Fax 206.654.2121
<br /> p. °�°, r Seattle,WA 98101
<br /> Gross Building Area: 1,533 SF 0 C s ° United States
<br /> •,� "• c.�,P " -
<br /> PROJECT SUMMARY O Ref.North
<br /> • o m8
<br /> Q.
<br /> Building Description:
<br /> Zoning: MU APPLICABLE CODES
<br /> Parcel lD#: 00581900001702
<br /> Scope of Work Details: BUILDING CODE: 2021 INTERNATIONAL BUILDING CODE(IBC)&WAC 51-50
<br /> 2021 INTERNATIONAL EXISTING BUILDING CODE(IEBC)
<br /> PROJECT IS AN EXTERIOR CANOPY DEMOLITION OF AN EXISTING BANK.NO ADDITIONAL AREA OR HEIGHT IS
<br /> PART OF THE SCOPE.SCOPE IS LIMITED TO EXTERIOR ONLY INCLUDING BUT NOT LIMITED TO DEMO OF ELECTRICAL CODE: 2023 NATIONAL ELECTRICAL CODE(NFPA 70)&WAC 296-46B-010
<br /> EXISTING CANOPY AND ASSOCIATED LIGHTING,SECURITY CAMERAS AND DOWNSPOUTS.
<br /> Separate Submittals:
<br /> 1. NIA
<br /> ABBREVIATIONS
<br /> A J
<br /> ACCES ACCESSORY JAN JANITOR
<br /> ACOUS ACOUSTICAL) K
<br /> AFF ABOVE FINISHED FLOOR KIT KITCHEN
<br /> AL ALUMINUM L
<br /> ALT ALTERNATE LAV LAVATORY GENERAL NOTES
<br /> ANNUNC ANNUNCIATOR LB POUND
<br /> ANOD ANODIZED LOUVER LOUVER
<br /> APPL APPLIANCE LT LIGHT 1. ALL WORK SHALL CONFORM TO THE AMERICAN WITH DISABILITIES ACT(A.D.A.)
<br /> AUTO AUTOMATIC LVLG LEVELING ACCESSIBILITY STANDARDS,WHERE APPLICABLE,ALONG WITH ALL STATE,COUNTY,AND
<br /> AVG AVERAGE M LOCAL APPLICABLE CODES,ORDERS,ORDINANCES AND REGULATIONS.PRIOR TO START
<br /> B M.E. MATCH EXISTING OF WORK,NOTIFYARCHITECT OF ANY DISCREPANCIES BETWEEN THE DRAWINGS AND
<br /> BD BOARD MAX MAXIMUM CODE.ALL WORK SHALL CONFORM TO THE MOST RESTRICTIVE REQUIREMENTS.
<br /> BLDG BUILDING MECH MECHANICAL 2. BEFORE COMMENCING WORK,CONTRACTOR SHALL BECOME FAMILIAR WITH THE
<br /> BLKG BLOCKING MEMB MEMBRANE DRAWINGS AND THE SCOPE OF WORK.CONTRACTOR SHALL VERIFY EXISTING CONDITIONS
<br /> BOLLD BOLLARD MET METAL AND DIMENSIONS AT THE SITE.ARCHITECT SHALL BE NOTIFIED OF DISCREPANCIES.
<br /> BRDLM BROADLOOM MEZZ MEZZANINE 3. BEFORE COMMENCING WORK,THE GENERAL CONTRACTOR SHALL SUBMIT AN ITEMIZED
<br /> COST BREAK DOWN OF ALL SCOPE ITEMS AND A CONSTRUCTION SCHEDULE TO THE BANK
<br /> BU BUILT UP MFD MANUFACTURED OF AMERICA PROJECT MANAGER AND THE ARCHITECT.WORK SHALL BE SCHEDULED TO
<br /> C MFR MANUFACTURER MEET BANK OF AMERICA REQUIREMENTS.
<br /> CAB CABINET MIN MINIMUM 4. ALL WORK DESCRIBED OR INDICATED IN THESE DOCUMENTS AND ALL WORK DEPENDENT
<br /> CEM CEMENT(ITIOUS) MISC MISCELLANEOUS UPON OR NECESSARY TO COMPLETE THIS WORK SHALL BE EXECUTED IN A WORKMAN-LIKE
<br /> CER CERAMIC MLWK MILLWORK MANNER CONSISTENT WITH THE BEST STANDARDS OF THE TRADE.ITEMS AND MATERIALS
<br /> USED SHALL BE SUITED FOR THE INTENDED PURPOSE.
<br /> Cl CONTINUOUS INSULATION MOIST MOISTURE 5. TRADESMEN,CRAFTSMEN,INSTALLERS,FOREMEN AND SUPERVISORS ARE TO BE SKILLED,
<br /> CMG CEILING MOT MOTORIZED) EXPERIENCED AND LICENSED IF REQUIRED IN THE WORK THEY WILL BE PERFORMING.
<br /> CMU CONCRETE MASONRY MTD MOUNTED 6. PROJECT CONSTRUCTION ITEMS TO BE NEW,UNLESS NOTED OTHERWISE.NO Date Description
<br /> UNIT N SUBSTITUTIONS WILL BE ALLOWED UNLESS COMPLETE DESCRIPTIONS,DRAWINGS,TEST 07/17/24 ISSUE FOR DEMO PERMIT
<br /> COATG COATING NIC NOT IN CONTRACT DATA,SAMPLES,COST AND SCHEDULED CHANGES ARE SUBMITTED BY THE CONTRACTOR
<br /> COILG COILING NO NUMBER AND APPROVED BY THE ARCHITECT PRIOR TO INSTALLATION.ANY ITEMS NOTED ON THE
<br /> CONC CONCRETE NTS NOT TO SCALE DRAWINGS THAT ARE NOT AVAILABLE OR WOULD CAUSE A TIME DELAY SHALL BE
<br /> CONSTR CONSTRUCTION 0 IDENTIFIED BY THE GENERAL CONTRACTOR AND THE ARCHITECT SHALL BE NOTIFIED.
<br /> CONT CONTINUOUS(ATION) OH OPPOSITE HAND 7. TYPICAL DETAILS AND GENERAL NOTES SHALL BE USED WHENEVER APPLICABLE U.N.O.
<br /> ALL SYMBOLS AND ABBREVIATIONS USED ON THE DRAWINGS ARE CONSIDERED
<br /> CONTR CONTRACT(OR) OPNG OPENINGS) CONSTRUCTION STANDARDS.IF CONTRACTOR HAS ANY QUESTIONS REGARDING THE
<br /> COV COVER OPP OPPOSITE SAME OR EXACT MEANING,ARCHITECT SHALL BE NOTIFIED FOR CLARIFICATION.
<br /> CPT CARPET OPR OPERABLE 8. DIMENSIONS ARE TO THE FACE OF FINISH ON EXISTING OR NEW WORK,UNLESS NOTED
<br /> D ORNA ORNAMENTAL OTHERWISE.DIMENSIONS SHALL HAVE PRECEDENCE OVER SCALE.LARGER SCALE
<br /> DEL DOUBLE OS OCCUPANCY SENSOR DRAWINGS SHALL HAVE PRECEDENCE OVER SMALLER SCALE DRAWINGS.
<br /> DEPT DEPARTMENT OVFL OVERFLOW 9. CONTRACTOR SHALL MAINTAIN A COMPLETE SET OF AS-BUILT DRAWINGS NOTING
<br /> DES DESIGNED) OVHD OVERHEAD DEVIATIONS BETWEEN THE DRAWINGS,THE ACTUAL FIELD CONDITIONS AND THE NEW
<br /> DET DETAIL p CONSTRUCTION OF ALL TRADES.AS-BUILT DRAWINGS SHALL BE DELIVERED TO BANK OF
<br /> OF DRINKING FOUNTAIN AMERICA AT THE END OF THE PROJECT.GENERAL CONTRACTOR SHALL PROVIDE ALL
<br /> PBD PARTICLE BOARD SUBCONTRACTORS WITH THE MOST CURRENT CONSTRUCTION DOCUMENTS THROUGHOUT
<br /> DIA DIAMETER PEDTR PEDESTRIAN THE PROJECT INCLUDING ALL REVISIONS.
<br /> DIFF DIFFUSER PLAM PLASTIC LAMINATE 10.CONTRACTOR TO NOTIFY ARCHITECT AND BANK OF AMERICA PROJECT MANAGER OF ALL
<br /> DIM DIMENSION PLAS PLASTER REVISIONS TO THE DRAWINGS AND CHANGES TO THE SCOPE OF WORK OR SCHEDULE AS
<br /> DISP DISPENSER PLSTC PLASTIC REQUIRED BY GOVERNING AGENCIES,FIELD CONDITIONS OR BANK OF AMERICA
<br /> DIV DIVISION PLYWD PLYWOOD PERSONNEL REGARDLESS OF EXTENT.ALL REVISIONS TO BE IN WRITING AS CHANGE
<br /> ON DOWN ORDERS AND APPROVED PRIOR TO STARTING WORK.
<br /> PNL PANEL 11.CONTRACTOR TO PROVIDE PROTECTIVE EQUIPMENT TO ENSURE THE LIFE SAFETY OF
<br /> DR DOOR POLYST POLYSTYRENE PUBLIC,TENANTS AND WORKERS AS REQUIRED BY FEDERAL,STATE AND LOCAL CODES
<br /> DSCON DISCONNECT PORT PORTABLE THROUGHOUT CONSTRUCTION.CONTRACTOR SHALL TAKE ALL NECESSARY MEASURES
<br /> DWR DRAWER PREFAB PREFABRICATED TO PROTECT PEDESTRIANS.
<br /> E PREFIN PREFINISHED 12.CONTRACTOR TO VERIFY EXISTING STRUCTURAL CONDITIONS AND REQUIREMENTS OF
<br /> ELAST ELASTOMERIC PRTECN PROTECTION NEW CONSTRUCTION PRIOR TO START OF WORK.CONTRACTOR SHALL FURNISH
<br /> ELEC ELECTRICAL PTN PARTITION ADEQUATE SHORING,BRACING,ETC.AS REQUIRED TO SAFETLY EXECUTE ALL WORK AND
<br /> EMBED EMBEDD(ED)(ING) R SHALL BE RESPONSIBLE FOR THE SAME,UNLESS SPECIFICALLY DETAILED IN THE
<br /> DRAWINGS.CONTRACTOR SHALL PROVIDE BLOCKING,BACKING,FRAMING,HANGERS,OR
<br /> ENGR ENGINEERED) RDR READER OTHER SUPPORTS AS NECESSARY FOR ALL FIXTURES,EQUIPMENT AND ALL OTHER ITEMS
<br /> ENTR ENTRANCE REC RECOMMENDED AS NECESSARY.
<br /> EQ EQUAL RECES RECESS(ED) 13.SITE AND BUILDING SHALL BE MAINTAINED IN A CLEAN,SAFE MANNER.DIRTY OR NOISY
<br /> EQUIP EQUIPMENT RECPT RECEPTACLE WORK SHALL BE PERFORMED AT SUCH A TIME AS DIRECTED BY THE OWNER AND/OR CITY.
<br /> EX EXISTING REF REFERENCE) ALL TRASH DEBRIS,SURPLUS MATERIAL,TOOLS AND EQUIPMENT TO BE REMOVED FROM
<br /> EXP JT EXPANSION JOINT REFL REFLECTED THE SITE AND DISPOSED OF IN A LEGAL MANNER.LEAVE PREMISES IN A CONDITION
<br /> SED ACCEPTABLE TO BANK OF AMERICA OR OWNER.
<br /> EXPS EXPO
<br /> ( ) REFR REFRIGERATOR 14. PROTECT AREA OF WORK AND ADJACENT AREAS FROM DAMAGE.WHERE EXISTING
<br /> EXT EXTERIOR READ REQUIRED CONSTRUCTION,FINISHES OR EQUIPMENT IS DAMAGED BY WORK IN THIS CONTRACT,IT
<br /> F RESIS RESIST(ANT)(IVE) SHALL BE PATCHED,REPAIRED OR REPLACED AS REQUIRED TO MATCH EXISTING AT NO
<br /> FAB FABRICATION RFG ROOFING COST TO BANK OF AMERICA.
<br /> FD FLOOR DRAIN RM ROOM 15.THE LOCATION AND ELEVATIONS OF ALL WORK TO BE CONSTRUCTED IS SHOWN ON THE
<br /> FIE FIRE EXTINGUISHER RO ROUGH OPENING DRAWINGS.UNLESS DISCREPANCIES ARE BROUGHT TO THE ATTENTION OF THE
<br /> FE&C FIRE EXTINGUISHER AND S ARCHITECT PRIOR TO CONSTRUCTION,THE CONTRACTOR SHALL BE HELD RESPONSIBLE
<br /> CABINET FOR THE PROPER LOCATION AND ELEVATIONS AS SHOWN AND INTENDED.
<br /> SCR SCRIBE 16.THE CONTRACTOR SHALL LAY-OUT THE WORK,ESTABLISH AND MAINTAIN NECESSARY
<br /> FHC FIRE HOSE CABINET SECUR SECURITY MARKERS AND BE RESPONSIBLE FOR THE ACCURACY OF THE WORK.THE CONTRACTOR
<br /> FIN FINISH SF SQUARE FEET SHALL MARK,AS A GUIDE TO ALL TRADES AND TO HIS SUBCONTRACTORS,THE EXACT
<br /> _ FLOG FOLDING SGL SINGLE LOCATIONS OF NEW OR REMODELED WORK WITH RESPECT TO ALL CHANGES TO EXISTING. Seal I Signature
<br /> FUR FLOORING) SHORG SHORING 17. PERTAINING TO EQUIPMENT:GENERAL CONTRACTOR IS RESPONSIBLE FOR THE REMOVAL
<br /> FOS FACE OF STUD SIM SIMILAR AND RELOCATION OF ANY EXISTING EQUIPMENT OR CONSTRUCTION AS NECESSARY FOR A
<br /> FPLC FIREPLACE COMPLETE INSTALLATION.
<br /> o SST STAINLESS STEEL
<br /> $ FIR FIRE RAT(ING)(ED) 18. BESIDES GUARANTEES REQUIRED ELSEWHERE,THE CONTRACTOR SHALL GUARANTEE ALL eac ar:n
<br /> STD STANDARD WORK FOR A MINIMUM PERIOD OF ONE YEAR AFTER THE DATE OF ACCEPTANCE OF WORK ru:cax ::r
<br /> FRMG FRAMING STL STEEL fff
<br /> FURN FURNITURE STRFR STOREFRONT MAY BE DISPLACED BY GENERAL CONTRACTOR'S WORK.HALL INCLUDE ANY WORK THAT
<br /> FWC FABRIC WALL COVERING STRUCT STRUCTURAL 19.OBTAIN AND PAY FOR PERMITS AND INSPECTIONS REQUIRED BY PUBLIC AUTHORITIES
<br /> o FXD FIXED SURF SURFACE GOVERNING THE WORK. 1.�1vts Ctlu
<br /> FXTR FIXTURE SUSP SUSPENDED 20. SUBMIT REQUESTS FOR SUBSTITUTIONS,REVISIONS,OR CHANGES TO ARCHITECT FOR arms on smsnxxroxox
<br /> O' SYS SYSTEM(S) REVIEW PRIOR TO PURCHASE,FABRICATION OR INSTALLATION.
<br /> GA GAUGE T 21.OWNER WILL PROVIDE WORK NOTED"BY OTHERS"OR"NIC"UNDER SEPARATE CONTRACT.
<br /> sL GFCI GROUN T8G TONGUE AND GROOVE D FAULT CIRCUIT CONTRACTOR SHALL INCLUDE SCHEDULE REQUIREMENTS IN CONSTRUCTION PROGRESS
<br /> m INTERRUPTER TG TEMPERED GLASS SCHEDULE AND COORDINATE TO ASSURE ORDERLY SEQUENCE OF INSTALLATION. Project Name
<br /> GFRC GLASS FIBER 22.CONTRACTOR TO COORDINATE TELECOMMUNICATIONS,DATA AND SECURITY SYSTEM
<br /> REINFORCED CONCRETE THK THICK INSTALLATIONS,
<br /> EVERGREEN AND 50TH
<br /> TLT TOILET
<br /> GFRG GLASS FIBER 23. PROTECT AREA OF WORK AND ADJACENTAREAS FROM DAMAGE.
<br /> REINFORCED GYPSUM TRAF TRAFFIC 24. DO NOT SCALE DRAWINGS.WRITTEN DIMENSIONS GOVERN.IN CASE OF CONFLICT,
<br /> a GFRP GLASS FIBER TRANS TRANSPARENT CONSULT THE ARCHITECT.
<br /> REINFORCED PLASTER TRTD TREATED Project Number
<br /> x GL GLASS TYP TYPICAL
<br /> GR GRAD(E)(ING) U 32.3190.010
<br /> 'p GYP GYPSUM UNDRLAY UNDERLAYMENT
<br /> H UON UNLESSOTHERWISE
<br /> HD HEAD NOTED Description
<br /> o HDWD HARDWOOD UTIL UTILITY DRAWING INDEX,PROJECT
<br /> HDWE HARDWARE VEH VEHICLE INFORMATION AND GENERAL NOTES
<br /> HM HOLLOW METAL HAZARDOUS MATERIALS NOTE
<br /> HORIZ HORIZONTAL VERT VERTICLE
<br /> HVAC HEATING,VENTILATING, VIF VERIFY IN FIELD
<br /> AND AIR CONDITIONING W
<br /> IN THE EVENT OF ASBESTOS OR OTHER TOXIC SUBSTANCE EXPOSURE OR THE
<br /> c W/ WITH Scale
<br /> INFILTR INFILTRATION W/O WITHOUT SUBSTANTIAL RISK THEREOF,CLIENT WILL HAVE THE DUN TO INFORM ARCHITECT OF SUCH
<br /> RISKS KNOWN OR REASONABLY KNOWABLE TO CLIENT.IF ASBESTOS OR ANY OTHER TOXIC
<br /> INFO INFORMATION WC WATER CLOSET SUBSTANCE,OR RISKS TO EXPOSURE THEREOF IS DISCOVERED BY ARCHITECT DURING NOT TO SCALE
<br /> INSTRUM INSTRUMENT(ATION) WD WOOD WORK ON THE PROJECT,ARCHITECT SHALL,IN ITS SOLE DISCRETION,HAVE THE RIGHT TO
<br /> INSUL INSULATION WOW WINDOW SUSPEND WORK ON THE PROJECT.CLIENT SHALL HAVE THE DUTY PROMPTLY TO RETAIN A
<br /> a INT INTERIOR WT WEIGHT QUALIFIED EXPERT SAFELY TO RENDER OR SUPERVISE THE REMOVAL OF SUCH ASBESTOS
<br /> INTLK INTERLOCKING) WTRPRF WATERPROOFING OR OTHER TOXIC SUBSTANCE.CLIENT SHALL INDEMNIFY AND HOLD ARCHITECT,ITS
<br /> AFFILIATES AND SUB-CONTRACTORS,AND THEIR OFFICERS,AGENTS AND EMPLOYEES O 0 0 O
<br /> HARMLESS FROM ANY AND ALL LIABILITY ON PART OF OR DAMAGE TO SUCH ENTITIES OR
<br /> PERSONS,INCLUDING THE COST OF LEGAL FEES AND EXPENSES,AS SUCH FEES AND ■
<br /> EXPENSES ARE INCURRED,WHICH MAY RESULT FROM ASBESTOS OR OTHER TOXIC
<br /> SUBSTANCE EXPOSURE ON THE PROJECT.
<br /> ©2023 Gensler
<br />
|