My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
202 ALDER ST Geotech Report 2025-07-30 (2)
>
Address Records
>
ALDER ST
>
202
>
Geotech Report
>
202 ALDER ST Geotech Report 2025-07-30 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/30/2025 2:44:57 PM
Creation date
7/30/2025 2:43:20 PM
Metadata
Fields
Template:
Address Document
Street Name
ALDER ST
Street Number
202
Notes
PRELIMINARY
Address Document Type
Geotech Report
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Proposed View Ridge Subsurface Exploration, Geologic Hazards, Infiltration Potential, <br /> Elementary School Replacement and Preliminary Geotechnical Engineering Report <br /> Everett, Washington Preliminary Design Recommendations <br /> that temporary, unsupported cut slopes in the existing fill can be made at a maximum slope of <br /> 1.5H:1V (Horizontal:Vertical) or flatter. Temporary slopes in unsaturated advance outwash <br /> may be planned at 1H:1V. As is typical with earthwork operations, some sloughing and <br /> raveling may occur, and cut slopes may have to be adjusted in the field. If ground water <br /> seepage is encountered in cut slopes, or if surface water is not routed away from temporary cut <br /> slope faces, flatter slopes will be required. In addition, WISHA/OSHA regulations should be <br /> followed at all times. Permanent cut and structural fill slopes that are not intended to be <br /> exposed to surface water should be designed at inclinations of 2H:1V or flatter. All permanent <br /> cut or fill slopes should be compacted to at least 95 percent of the modified Proctor maximum <br /> dry density, as determined by ASTM:D 1557, and the slopes should be protected from erosion <br /> by sheet plastic until vegetation cover can be established during favorable weather. <br /> 9.7 Frozen Subgrades <br /> If earthwork takes place during freezing conditions, all exposed subgrades should be allowed to <br /> thaw and then be recompacted prior to placing subsequent lifts of structural fill or foundation <br /> components. Alternatively, the frozen material could be stripped from the subgrade to reveal <br /> unfrozen soil prior to placing subsequent lifts of fill or foundation components. The frozen <br /> soil should not be reused as structural fill until allowed to thaw and adjusted to the proper <br /> moisture content, which may not be possible during winter months. <br /> 10.0 STRUCTURAL FILL <br /> All references to structural fill in this report refer to subgrade preparation, fill type and <br /> placement, and compaction of materials, as discussed in this section. If a percentage of <br /> compaction is specified under another section of this report, the value given in that section <br /> should be used. <br /> After stripping, planned excavation, and any required overexcavation have been performed to <br /> the satisfaction of the geotechnical engineer, the upper 12 inches of exposed ground in areas to <br /> receive fill should be recompacted to 90 percent of the modified Proctor maximum density <br /> using ASTM:D 1557 as the standard. If the subgrade contains silty soils and too much <br /> moisture, adequate recompaction may be difficult or impossible to obtain, and should probably <br /> not be attempted. In lieu of recompaction, the area to receive fill should be blanketed with <br /> washed rock or quarry spalls to act as a capillary break between the new fill and the wet <br /> subgrade. Where the exposed ground remains soft and further overexcavation is impractical, <br /> placement of an engineering stabilization fabric may be necessary to prevent contamination of <br /> the free-draining layer by silt migration from below. <br /> September 22, 2010 ASSOCIATED EARTH SCIENCES, INC. <br /> EWG1tb-KE100255R2-Projects1201002551KEIWP Page 16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.