Proposed View Ridge Subsurface Exploration, Geologic Hazards, Infiltration Potential, <br /> Elementary School Replacement and Preliminary Geotechnical Engineering Report <br /> Everett, Washington Preliminary Design Recommendations <br /> that temporary, unsupported cut slopes in the existing fill can be made at a maximum slope of <br /> 1.5H:1V (Horizontal:Vertical) or flatter. Temporary slopes in unsaturated advance outwash <br /> may be planned at 1H:1V. As is typical with earthwork operations, some sloughing and <br /> raveling may occur, and cut slopes may have to be adjusted in the field. If ground water <br /> seepage is encountered in cut slopes, or if surface water is not routed away from temporary cut <br /> slope faces, flatter slopes will be required. In addition, WISHA/OSHA regulations should be <br /> followed at all times. Permanent cut and structural fill slopes that are not intended to be <br /> exposed to surface water should be designed at inclinations of 2H:1V or flatter. All permanent <br /> cut or fill slopes should be compacted to at least 95 percent of the modified Proctor maximum <br /> dry density, as determined by ASTM:D 1557, and the slopes should be protected from erosion <br /> by sheet plastic until vegetation cover can be established during favorable weather. <br /> 9.7 Frozen Subgrades <br /> If earthwork takes place during freezing conditions, all exposed subgrades should be allowed to <br /> thaw and then be recompacted prior to placing subsequent lifts of structural fill or foundation <br /> components. Alternatively, the frozen material could be stripped from the subgrade to reveal <br /> unfrozen soil prior to placing subsequent lifts of fill or foundation components. The frozen <br /> soil should not be reused as structural fill until allowed to thaw and adjusted to the proper <br /> moisture content, which may not be possible during winter months. <br /> 10.0 STRUCTURAL FILL <br /> All references to structural fill in this report refer to subgrade preparation, fill type and <br /> placement, and compaction of materials, as discussed in this section. If a percentage of <br /> compaction is specified under another section of this report, the value given in that section <br /> should be used. <br /> After stripping, planned excavation, and any required overexcavation have been performed to <br /> the satisfaction of the geotechnical engineer, the upper 12 inches of exposed ground in areas to <br /> receive fill should be recompacted to 90 percent of the modified Proctor maximum density <br /> using ASTM:D 1557 as the standard. If the subgrade contains silty soils and too much <br /> moisture, adequate recompaction may be difficult or impossible to obtain, and should probably <br /> not be attempted. In lieu of recompaction, the area to receive fill should be blanketed with <br /> washed rock or quarry spalls to act as a capillary break between the new fill and the wet <br /> subgrade. Where the exposed ground remains soft and further overexcavation is impractical, <br /> placement of an engineering stabilization fabric may be necessary to prevent contamination of <br /> the free-draining layer by silt migration from below. <br /> September 22, 2010 ASSOCIATED EARTH SCIENCES, INC. <br /> EWG1tb-KE100255R2-Projects1201002551KEIWP Page 16 <br />