Laserfiche WebLink
0 <br />VERETT <br />Permit Inspections <br />City of Everett <br />11/19/2021 <br />11/19/2021 <br />BLDG 01- <br />KURT KECK <br />NOT REQUIRED <br />CONSULTATION <br />Notes: <br />11/17/2021 4:30 AM RIVERFRONT COMMRCL INVEST LLC <br />PreCon for Post Tension Slab - With Structural Engineer 11/19-2021@9:30 am <br />Contact Name: Bill Classon <br />Site Address: 11624 SE 5th, Suite 210 <br />Phone:4254635011 <br />e-Mail: bill.classon@shelterholdings.com <br />BLDG 09-FIRE <br />1/20/2022 <br />1/20/2022 <br />STOPPING/BLOCKIN <br />KURT KECK <br />PARTIAL <br />L2 Grid 9.5 partial on Area sep wall <br />APPROVAL <br />G <br />Notes: <br />1/19/2022 10:46 AM Young Kim <br />Request Morning inspection the area of separation fire wall at gridline 9.5, interior gyp nailing. <br />Please call when arrival on Site. <br />Contact Name: Young Kim <br />Site Address: 3810 RIVERFRONT BLVD <br />Phone:4259415772 <br />e-Mail: young.kim@shelterholdings.com <br />(1/20/2022 9:37 AM KMK) <br />L2 grid 9.5 two hour fire separation wall <br />1. inside layers of dense glass ok <br />2. fire blocking at top of wall ok <br />3. fire blocking installed veritcally every 10' horizontally ok <br />Kkeck@everettwa.gov <br />BLDG 09-FIRE <br />2/4/2022 <br />2/4/2022 <br />STOPPING/BLOCKIN <br />KURT KECK <br />CORRECTION <br />see notes <br />G <br />REQUIRED <br />Notes: <br />2/3/2022 7:03 AM Young Kim <br />Request inspection for the area of separation fire wall at Level 3 - gridline 9.5, interior gyp nailing. <br />Contact Name: Young Kim <br />Site Address: 3810 RIVERFRONT BLVD <br />Phone:4259415772 <br />e-Mail: young.kim@shelterholdings.com <br />(2/4/2022 4:40 PM KMK) <br />Fire stopping was not completed when I was on site. <br />�A_ <br />Printed: Thursday, 21 September, 2023 3 of 36 rk <br />SUPERION <br />