Laserfiche WebLink
Page 2 of 2 <br />__ <br />an&Ass ociate s, Inc. <br />Geotechnical Engineering* Environmental Engineering <br />Construction Testing and Inspection <br />Field <br />Report NO.: 09621171DFR9282021NTS <br />Note: <br />✓ Required minimum rebar clearances should be maintained on all sides. <br />✓ Any other itmes (plastic bottles, wood pieces, extra tie wires etc) that are unassociated with the <br />concrete placements should be removed from the pour area. <br />✓ At the time of our visit, rebar installing & tying works were in -progress. Rebars were inspected <br />after Ironworkers install them in -place. <br />It <br />Reviewed <br />ASTM Test it: <br />_I <br />Asset Number(s <br />To the best of my knowledge, the above WAS performed in accordance with the approved plans, specifications and <br />regulatory requirements. <br />Technician: <br />Offices Serving the Western United States <br />Lynnwood (425) 485-5519 • Poulsbo (360) 598-2126 • Tacoma (253) 939-2500 <br />The information provided on this report is prepared for the exclusive uae of the client. This report may not be reproduced in any format without the written permission of the client and Krazan & Associates. This report <br />indicates our inspectors observation and testing results based on site conditions and contractor activities. This information is subject to review prior to final submittal. By signing this report, our inspector does not accept <br />responsibility for validity of results. The same information has been provided by others on site. The test results apply only to the specific locations, and items inspected or tested. <br />