Laserfiche WebLink
Pagel of 2 <br />; <br />[(Man&Associates, Inc. <br />Geotechnical Engineering . Environmental Engineering <br />Construction Testing and Inspection <br />DATE: 10/7/2021 <br />Field <br />Report NO.: 096211711072021JA <br />Set Count: CONTRACTOR: Shelter <br />PROJECT #: 09621171 PERMIT #: B1912-032 <br />PROJECT: Riverfront B1dg.B INSPECTOR: Joseph Aranas <br />LOCATION: 3810 Riverfront Blvd. JURISDICTION: City of Everett <br />KA P.M.: JM WEATHER: Mostly Sunny TEMP: 54' F <br />Report #049 <br />Reinforcing Steel Inspection: <br />A Krazan & associate arrived onsite on -time for Reinforcing steel Inspection, we met with the contractor <br />discuss about the detail of the inspection. Contractor placed the reinforcing steel at Columns grid line @ <br />15/I.8, G, 16/I.8, G, 19/L, 20/L, 21.7/L, Elevator wall grid line @ 19.2-20/E-F. We verified the reinforcing <br />steel for size, grade, clearances, Dimension, Spacing, Lap splice, vertical bar. See structural note S2.1B, <br />19 & 20/S6.05, 17/S6.03 for more details. <br />In our opinion, the reinforcing steel was place in general accordance to the approved plan and specification. <br />Photos <br />Offices Serving the Western United States <br />Lynnwood (425) 485-5519 - Poulsbo (360) 598-2126 - Tacoma (253) 939-2500 <br />The information provided on this report is prepared for the exclusive use of the client. Ibis report may not be reproduced in arty formal without the written permission of the client and Krazan & Associates. This report <br />indicates our inspectors observation and testing results based on site conditions and cont ador activities. This information is subject to review prior to final submittal. By signing this report, our inspector does not accept <br />responsibility for validity of results. The same information has been provided by others on site. The test results apply only to the specific locations, and items inspected or tested. <br />