My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3810 RIVERFRONT BLVD BLDG B 2025-10-27
>
Address Records
>
RIVERFRONT BLVD
>
3810
>
BLDG B
>
3810 RIVERFRONT BLVD BLDG B 2025-10-27
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/27/2025 10:21:17 AM
Creation date
7/31/2025 10:20:58 AM
Metadata
Fields
Template:
Address Document
Street Name
RIVERFRONT BLVD
Street Number
3810
Tenant Name
BLDG B
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
544
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 1 of 2 <br />-�s-11(IUZan & A s s o c i a t e s, I n c. <br />Geotechnical Engineering * Environmental Engineering <br />Construction Testing and Inspection <br />DATE: 10/28/2021 <br />Field <br />Report NO.: 09621171DFR10282021NTS <br />Set Count: CONTRACTOR: SHELTER HOLDINGS <br />FKUJ hU r #: 09621171 PERMIT #: B 1912-032 <br />PROJECT: RIVERFRONT (BUILDING - B) INSPECTOR: NIMA T SHERPA <br />LOCATION: 3810 RIVERFRONT BLVD, EVERETT JURISDICTION: CITY OF EVERETT/ SNOHOMISH CO. <br />KA P.M.: JM WEATHER: CLOUDY TEMP- 500 F <br />REPORT #063 <br />On site as requested for reinforcing steel bars inspection. Upon arrival at the site, we met with <br />Contractors and discussed about project requirements. <br />Rebars were inspected at the following(s)• <br />✓ BUILDING B (SOUTH); SOG TO L1 WALL & COLUMNS <br />(Highlighted areas below) <br />Reinforcing steel bar(s) of above referenced areas were checked for size, grade, count, cover, lap <br />splice, spacing, cleanliness etc. At the time of inspection, they all appeared to be clean, free of dirt, <br />grease, oil & other deleterious substances and tied in -place per approved plan & section details. <br />+ 06 wI. t -1^ . I Ri <br />' ttdg � �punaallon elan (South) <br />"o.) <br />"1c.g <br />Note: <br />✓ Required minimum rebar clearances should be maintained on all sides. <br />✓ Any other itmes that are unassociated with concrete placements should be removed from the <br />pour area. <br />✓ Reinforcing steel bars were inspected after Ironworkers fix deficiencies and place all other <br />missing items. <br />✓ Crew also drilled and epoxied missing C3 columns/pilaster dowels (highlighted areas). <br />- Holes were drilled and cleaned using wire brush & pressurized air machine. Just prior to <br />dispensing adhesives into them, we checked some of those holes and they all appeared to be <br />correct size, depth and free of dust & debris. Total (12) #5 vertical rebar dowels were inserted <br />Offices Serving the Western United States <br />Lynnwood (425) 485-5519 a Poulsbo (360) 598-2126 • Tacoma (253) 939-2500 <br />The information provided on this report is prepared for the exclusive use of the client This report may not be reproduced in any format without the written permission of the client and Krazan & Associates. This report <br />indicates our inspectors observation and testing results based on site conditions and contractor activities. This information is subject to review prior to final submittal. By signing this report, our inspector does not accept <br />responsibility for validity of results. The same information bas been provided by others on site. The test results apply only to the specific locations, and items inspected or tested. <br />
The URL can be used to link to this page
Your browser does not support the video tag.