Laserfiche WebLink
Page 1 of 1 <br />An <br />--> &Associates,Inc. <br />Geotechnical Engineering* Environmental Engineering <br />Construction Testing and Inspection <br />Field <br />Report NO.:0962117111152021JA <br />DATE: 11/15/2021 Set Count: CONTRACTOR: Shelter holdings <br />PROJECT #: 09621171 PERMIT #: B1912-032 <br />PROJECT: Riverfront B1dg.B INSPECTOR: Joseph Aranas <br />LOCATION: 3810 Riverfront Blvd. JURISDICTION: City of Everett <br />KA P.M.: JM WEATHER: Rain TEMP: 54' F <br />Report #069 <br />Reinforcing Steel Inspection: <br />A Krazan & associate arrived onsite on -time for reinforcing steel Inspection, we met with the contractor discussed about the <br />details of inspection. Contractor placed the reinforcing steel at columns grid line @ D/3, 5, D.5/3, H/3, 4. We verified the <br />reinforcing steel for size, grade, clearances, dimension, spacing, lap splice, vertical & horizontal bar. See structural notes S2.11B, <br />S6.03 for more details. <br />In our opinion, the reinforcing steel was place in general accordance to the approved plan and specification. <br />Photos <br />Note: <br />1. On my previous report dated 11/11/2021 noted item for columns grid line D/3, 5 we verified the ties spacing & bar <br />that are congested they cut the vertical bar dowels that they don't need, during the conversation of contractor & FOR <br />he approved to cut the bars, per conversation with the contractor those vertical bars that they cut are those vertical bar <br />they added when they pour the footings, development length for #6 bar is 23". <br />Reviewed By: ASTM Test #: Asset Numbe sJ) <br />To the best of my knowledge, the above WAS performed in accordance with the approved plans, specifications and <br />regulatory requirements. <br />Superintendent/Representative: Technician: <br />Joseph Aranas <br />Offices Serving the Western United States <br />Lynnwood (425) 485-5519 - Poulsbo (360) 598-2126 - Tacoma (253) 939-2500 <br />The information provided on this report is prepared for the exclusive use of the client. Ibis report may not be reproduced in any format without the written permission of the client and Krxmn & Associates. This report <br />indicates our inspectors observation and testing results based on site conditions and contractor activities. This information is subject to review prior to final submittal. By signing this report, our inspector does not accept <br />responsibility for validity of results. The same information has been provided by others on site. The test results apply only to the specific locations, and items inspected or tested. <br />