Laserfiche WebLink
Page 1 of 3 <br />djKmzan&Associates, I nc. <br />Geotechnical Engineering . Environmental Engineering <br />Construction Testing and Inspection <br />Field <br />Report NO.: 0962117111232021CG <br />DATE: 11/23/2021 Set Count: CONTRACTOR: Shelter Holdings <br />PROJECT #: 09621171 PERMIT #: B 1912-032 <br />PROJECT: River&ont Building B INSPECTOR: Charles Green <br />LOCATION: 3810 Riverfront Boulevard JURISDICTION: City of Everett <br />KA P.M.: Jeff Mercer WEATHER: Overcast/Rain TEMP: 42' F <br />Report #74 <br />Inspector arrived on site at Contractor's (Shelter Holdings) request <br />to perform a visual inspection of reinforcing steel for cast -in -place <br />walls prior to the placement of concrete. On arrival, Inspector met <br />with contractor representative to determine the scope of work for the <br />day and to review the on -site permit plan set. <br />Inspector noted the formwork was commercial reusable formwork, and the <br />dimensions conformed with approved plans, and wall form sections <br />already installed were sufficiently braced to resist concrete <br />placement pressures and to maintain dimensionality during the <br />placement and internal vibratory consolidation of concrete. <br />Reinforcing steel was the correct size and type per plans, and was <br />spliced in conformance with the reinforcing steel splice tables in the <br />permit plan notes. No exceptions were noted, and contractor will have <br />areas that were still in progress during the inspection inspected <br />prior to the closing up of forms in preparation for the placement of <br />concrete. <br />Wall Resteel in progress <br />Offices Serving the Western United States <br />Lynnwood (425) 485-5519 • Poulsbo (360) 598-2126 • Tacoma (253) 939-2500 <br />The information provided on this report is prepared for the exclusive use of the client, This report may not be reproduced in any format without the written permission of the client and Krazan & Associates. This report <br />indicates our inspectors observation and testing results based on site conditions and contractor activities. This information is subject to review prior to final submittal. By signing this report, our inspector does not accept <br />responsibility for validity of results. The same information has been provided by others on site. The test results apply only to the specific locations, and items inspected or tested <br />