My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3810 RIVERFRONT BLVD BLDG B 2025-10-27
>
Address Records
>
RIVERFRONT BLVD
>
3810
>
BLDG B
>
3810 RIVERFRONT BLVD BLDG B 2025-10-27
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/27/2025 10:21:17 AM
Creation date
7/31/2025 10:20:58 AM
Metadata
Fields
Template:
Address Document
Street Name
RIVERFRONT BLVD
Street Number
3810
Tenant Name
BLDG B
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
544
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 <br />VERETT <br />Permit Inspections <br />City of Everett <br />eric.evans@shelterholdings.com <br />425-559-2300 <br />BLDG 09-FIRE <br />11/7/2022 <br />11/7/2022 <br />STOPPING/BLOCKIN <br />RAKEEB KHAN <br />CORRECTION <br />eTRAKiT Inspection Request <br />REQUIRED <br />G <br />Notes: <br />11/3/2022 8:39 AM RIVERFRONT COMMRCL INVEST LLC <br />Building B Level 3 North firestopping in soffits units 319-334 <br />Contact Name: RIVERFRONT COMMRCL INVEST LLC <br />Site Address: 3810 RIVERFRONT BLVD <br />Phone:4253933123 <br />e-Mail: kyle.norris@shelterholdings.com <br />Complete fireproofing at penetrations. Inspected with Dave <br />11/7/2022 <br />1/7/2022 <br />T <br />BLDG 10-DRYWALL <br />RAKEEB KHAN <br />PARTIAL <br />see notes <br />NAILING <br />APPROVAL <br />Notes: <br />11/3/2022 8:47 AM RIVERFRONT COMMRCL INVEST LLC <br />Building B - level 2 south drywall inspection. Units 201-218, corridor, idf, and electrical room <br />Contact Name: RIVERFRONT COMMRCL INVEST LLC <br />Site Address: 3810 RIVERFRONT BLVD <br />Phone:4253933123 <br />e-Mail: kyle.norris@shelterholdings.com <br />Ok for units 201-218 only. Remove 1 layer of drywall on ceiling to verify offset in corridor idf and electrical room. <br />BLDG 09-FIRE <br />11/8/2022 <br />11/8/2022 <br />STOPPING/BLOCKIN <br />BLDG INSPECTOR <br />PARTIAL <br />eTRAKiT Inspection Request <br />APPROVAL <br />G <br />Notes: <br />11/7/2022 12:06 PM RIVERFRONT COMMRCL INVEST LLC <br />Building B Level 3 North firestopping in soffits units 319-334 and corridor soffits <br />Contact Name: RIVERFRONT COMMRCL INVEST LLC <br />Site Address: 3810 RIVERFRONT BLVD <br />Phone:4253933123 <br />e-Mail: kyle.norris@shelterholdings.com <br />Building B Level 3 North firestopping in soffits units 319-334 and corridor soffits. Ok to cover. Elevator lobby ceiling not ready. <br />11/8/2022 <br />11/8/2022 <br />BLDG 10-DRYWALL <br />BLDG INSPECTOR <br />PARTIAL <br />eTRAKiT Inspection Request <br />NAILING <br />APPROVAL <br />Notes: <br />11/7/2022 12:07 PM RIVERFRONT COMMRCL INVEST LLC <br />Building B - level 2 south drywall inspection. Units 201-218, corridor, idf, and electrical room. <br />This was called in and unit were already passed. Only the corridor and electrical room did not have an inspection piece. I put the entire south side so it <br />was documented. <br />Contact Name: RIVERFRONT COMMRCL INVEST LLC <br />Site Address: 3810 RIVERFRONT BLVD <br />Phone:4255592300 <br />e-Mail: eric.evans@shelterholdings.com <br />Building B - level 2 south drywall inspection. corridor, and electrical room. <br />�A_ <br />Printed: Thursday, 21 September, 2023 26 of 36 rk <br />SUPERION <br />
The URL can be used to link to this page
Your browser does not support the video tag.