Laserfiche WebLink
Page 1 of 2 <br />— 14(razan&Associates, I nc. <br />AAW SO <br />Geotechnical Engineering . Environmental Engineering <br />Construction Testing and Inspection <br />Field <br />Report NO.: 09621171DFR3162022NTS <br />DATE: 3/16/2022 Set Count: CONTRACTOR: SHELTER HOLDINGS/ RICH BROTHERS <br />PROJECT #: 09621171 PERMIT #: B 1912-032 <br />PROJECT: RIVERFRONT (BUILDING - B) INSPECTOR: NIMA T SHERPA <br />LOCATION: 3910 RIVERFRONT BLVD, EVERETT JURISDICTION: CITY OF EVERETT/ SNOHOMISH CO. <br />KA P.M.: JM WEATHER: CLOUDY TEMP: 39' F <br />(REPORT #108) <br />On site as requested for reinforcing steel bars inspection. Upon arrival at the site, we met with <br />contractors and discussed about project requirements. <br />Rebars were inspected at the following(s): <br />✓ BUILDING B (SOUTH) - CURB/ STEM WALLS <br />(Highlighted areas below) <br />.. ,�. <br />E <br />Reinforcing steel bar(s) of above referenced curb/stem wall areas were inspected for size, grade, count, <br />cover, lap splice, spacing, cleanliness etc. At the time of inspection, they all appeared to be in -place <br />per approved plan & section details. <br />Note: <br />- At the time of our visit, crew members were just beginning to install waterstops. We were also <br />scheduled on site for the—11:00am concrete pour. After waiting for some time on site, Rich <br />Brothers crew informed that the pour has been pushed back to —1:00 pm this afternoon. <br />Because of scheduleing conflict with the second job, another Krazan associates will be on site <br />to sample and observe the concrete pour. <br />Offices Serving the Western United States <br />Lynnwood (425) 485-5519 • Poulsbo (360) 598-2126 • Tacoma (253) 939-2500 <br />The information provided on this report is prepared for the exclusive use of the client. This report may not be reproduced in any format without the written permission of the client and K= & Associates. This report <br />indicates our inspectors observation and testing results based on site conditions and contractor activities. This information is subject to review prior to final submittal. By signing this report, our inspector does not accept <br />responsibility for validity of results. The same information has been provided by others on site. The test results apply only to the specific locations, and items inspected or tested. <br />