Laserfiche WebLink
Page 1 of 1 <br />&Associates, I nc. <br />Geotechnical Engineering . Environmental Engineering <br />Construction Testing and Inspection <br />Field <br />Report NO.: 09621171DFR4122022GM <br />DATE: 4/12/2022 Set Count: CONTRACTOR: Shelter Holdings <br />PROJECT #: 09621171 PERMIT #: B1912 - 032 <br />PROJECT: Riverfront Building B INSPECTOR: G. Moe <br />LOCATION: 3810 Riverfront Blvd JURISDICTION: City of Everett <br />KA P.M.: WEATHER: Overcast, TEMP: 38' F <br />REPORT #116 <br />As requested by Shelter Holdings; <br />Inspected the attachment of OSB sheathing and the appurtenances of Simpson hardware as installed for <br />L6 Interior Shear Walls, Grids A — R and Lines 17 - 22 and the attachment of OSB sheathing and <br />diaphragm nailing at Roof, Grids A — R and Lines 17 — 22. <br />Found work and materials to be in conformance with the City of Everett approved project plans and <br />specifications. <br />Reviewed <br />To the best of my know4 <br />regulatory requirements. <br />ASTM Test <br />Asset <br />the above WAS performed in accordance with the approved plans, specifications and <br />Offices Serving the Western United States <br />Lynnwood (425) 485-5519 • Poulsbo (360) 598-2126 • Tacoma (253) 939-2500 <br />The information provided on this report is prepared for the exclusive use of the client. This report may not be reproduced in any formal without the written permission of the client and Kruan @ Associates. This report <br />indicates our inspectors observation and testing results based on site conditions and contractor activities. This information is subject to review prior to final submittal. By signing this report, our inspector does not accept <br />responsibility for validity of results. The same information has been provided by others on site. The test results apply only to the specific locations, and items inspected or tested. <br />