Laserfiche WebLink
Page 1 of 1 <br />1'(17aZan &Asscciates,Inc. <br />Geotechnical Engineering • Environmental Engineering <br />Construction Testing and Inspection <br />Field <br />Report NO.: 09621171DFR592022GM <br />DATE: 5/9/2022 Set Count: CONTRACTOR: Shelter Holding <br />PROJECT #: 09621171 PERMIT #: BB1912-032 <br />PROJECT: Riverfront Building B INSPECTOR: G. Moe <br />LOCATION: 3810 Riverfront Blvd JURISDICTION: City of Everett <br />KA P.M.: WEATHER: Cloud TEMP: 50 <br />REPORT #119 <br />As requested by Shelter Holdings; <br />Made preliminary inspection of L2 Sole Plates and the installation of anchor bolts for same. <br />Found work and materials to b5#gely deficient throughout and otherwise not ready for inspection. <br />Reviewed By: ��/�J`-f'r-� I ASTM Test #: I I Asset Number(s): <br />To the best of my knowledge, the above WAS NOT performed in accordance with the approved plans, specifications <br />and regulatory requirements. <br />Technician: <br />Offices Serving the Western United States <br />Lynnwood (425) 485-5519 - Poulsbo (360) 598-2126 - Tacoma (253) 939-2500 <br />The information provided on this report is prepared for the exclusive use of the client Ibis report may not be reproduced in any format without the written permission of the client and Krazan & Associates. This report <br />indicates our inspectors observation and testing results based on site conditions and contractor activities. this information is subject to review prior to final submittal. By signing this report, our inspector does not accept <br />responsibility for validity ofresults. The same information has been provided by others on site. The test results apply only to the specific locations, and items inspected or tested. <br />