Laserfiche WebLink
0 <br />VERETT <br />Permit Inspections <br />City of Everett <br />9/8/2023 <br />9/8/2023 <br />FIRE 03-BLDG FINAL <br />BRONSON <br />APPROVAL <br />See notes <br />FOR FIRE <br />PEARSON <br />Notes: <br />Okay to final per FD. Permanent signs have been ordered for FACP and Sprinkler Riser door. Temporary sign is in place now. <br />Permanent "Fire Alarm/Sprinkler" sign is now in place. <br />9/13/2023 <br />9/14/2023 <br />SPECIAL <br />RAKEEB KHAN <br />ACCEPTED <br />INSPECTION <br />Notes: <br />Review all special inspection attachments uploaded by applicant. <br />9/18/2023 <br />9/18/2023 <br />ADMIN OTHER <br />RAKEEB KHAN <br />ACCEPTED <br />Building Enclosure document RCW <br />64.55 <br />Notes: <br />RCW 64.55 paperwork was submitted with permit documents prior to permit issuance. <br />A signed letter from an independent inspector certifying that the building enclosure has been inspected during the course of construction and has been <br />constructed in substantial compliance with the building enclosure design documents. <br />9/19/2023 <br />9/19/2023 <br />BLDG 16-FINAL <br />RAKEEB KHAN <br />PARTIAL <br />eTRAKiT Inspection Request <br />APPROVAL <br />Notes: <br />9/15/2023 10:06 AM Young Kim <br />In addition to requested Final, includes remain Level 2 inspection and for sign off. Please contact Renay Luzama at 425-281-7117 upon arrival. <br />Contact Name: Young Kim <br />Site Address: 3810 RIVERFRONT BLVD <br />Phone:4259415772 <br />e-Mail: young.kim@shelterholdings.com <br />This inspection request is to final Level 2. If approved, result as Partial Approval - Level 2 only. Building Permit final will be requested separately after <br />administrative items are complete. OK to do final walk-through if desired at this time to final permit once administrative items are complete. <br />Contractor fixing exit sign on level 6 and adding grab bars for all accessible bathrooms. Waiting on admin items and approval. See File review inspection <br />on 9/20/2023. <br />9/19/2023 <br />9/19/2023 <br />SPECIAL <br />RAKEEB KHAN <br />ACCEPTED <br />see notes <br />INSPECTION <br />Notes: <br />Need final letter from engineer of record and geotechnical engineer <br />See attachments (Final CQA Summary Report, Bld B HWA.pdf) and Everett Riverfront Bldg B 23 0427 CT Final Observation.pdf). <br />Engineer letters (structural and geotechnical) accepted. <br />9/20/2023 <br />9/20/2023 <br />BLDG 16-FINAL <br />RAKEEB KHAN <br />APPRVD-PERMIT <br />FINAL <br />Notes: <br />This inspection is for permit final/close-out. <br />Contact Renay upon arrival at 425-281-7117. <br />rescheduled from 9/21 to 9/20 <br />Note all work on first level was special inspected. <br />9/20/2023 <br />9/20/2023 <br />CERTIFICATE OF <br />SABRINA GOOD <br />APPROVAL <br />Issued - see attached <br />OCCUPANCY <br />Notes: <br />�A_ <br />Printed: Thursday, 21 September, 2023 35 of 36 rk <br />SUPERION <br />