Laserfiche WebLink
Page 1 of 1 <br />AM .® KmzanStAssociates,Inc. Field <br />Geotechnical Engineering . Environmental Engineering Report NO.: 09621171DFR452023ZZ <br />Construction Testing and Inspection <br />DATE: 4/5/2023 <br />Set Count: CONTRACTOR: SHFT TF.R 140T.nnvr1c <br />rN"JM11 ff: U90211 /1 PERMIT #: B1912-032 <br />PROJECT: RIVERFRONT BLDG "B" e�:� Ht INSPECTOR: Zelalem Zerihun <br />LOCATION: 3810 Riverfront Blvd, Everett WA JURISDICTION: EVERETT <br />KA P.M.: Jeffrey S. Mercer WEATHER: Cloud TEMP: 45' F <br />A Krazan & Associates, Inc. representative visited the above -said project as per contractor's request <br />and inspected fireproofing intumescent paint. <br />Thin Film Intumescent Fire -Resistive Material (TFIFRM) from SHERWIN-WILLIAMS was applied <br />for two-hour rated WF steel beams (2)W10X30 at mezzanine level (level 1B) using brushes. <br />Based on the exposure surface of the beams and UL design # Y623 & N636, Sherwin-Williams <br />designed using FIRTEX Design Estimator Software and provided the following thickness threshold <br />requirements: <br />1) W l OX30 at 1 — 7/D.3 on LIB, DFT = 221 mils and <br />2) W10X30 at 2.5 — 6.5/H on LIB, DFT = 170 mils. <br />Dry film thicknesses [DFT] of the paint on beams were tested using a digital thickness gauge called <br />PosiTector 6000 and compared with the thicknesses. GC representative presented and witnessed <br />calibration of equipment PosiTector 6000 and thickness measurement & reading. <br />Field testing of DFT was conducted in accordance with 2015 IBC chapter 17, ASTM E605, AWCI <br />(Technical 12-B). The DFT reading varies widely and are below the minimum threshold given to us <br />[see above] and recommended to add more intumescent paint. <br />* Note that the top flange of the beams along H-line was not painted at the high flute of the metal <br />deck. The gap between the beam and the deck high flute will be filled in later with fire rated material. <br />.V <br />Reviewed By: J jam, '- I ASTM Test #: <br />To the best of4y knowledge, the above WAS NOT performed in accordance with the approved plans, specifications <br />and regulatory requirements. <br />Technician: <br />Offices Serving the Western United States <br />Lynnwood (425) 485-5519 - Poulsbo (360) 598-2126 - Tacoma (253) 939-2500 <br />The information provided on this report is prepared for the exclusive use of the client. This report may not be reproduced in any format without the written permission of the client and Km & Associates. Tbis report <br />indicates our inspectors observation and testing results based on site conditions and contractor activities. This information is subject to review prior to final submittal. By signing this report, our inspector does not accept <br />responsibility for validity of results. The same information has been provided by others on site. <br />