My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3810 RIVERFRONT BLVD BLDG B 2025-10-27
>
Address Records
>
RIVERFRONT BLVD
>
3810
>
BLDG B
>
3810 RIVERFRONT BLVD BLDG B 2025-10-27
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/27/2025 10:21:17 AM
Creation date
7/31/2025 10:20:58 AM
Metadata
Fields
Template:
Address Document
Street Name
RIVERFRONT BLVD
Street Number
3810
Tenant Name
BLDG B
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
544
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 1 of 1 <br />V#%.r,2aan&Associates, Inc. <br />Geotechnical Engineering* Environmental Engineering <br />Construction Testing and Inspection <br />Field <br />Report NO.: 09621171DFR4212023ZZ <br />DATE: 4/21/2023 Set Count: CONTRACTOR: SHELTER HOLDINGS <br />PROJECT #: 09621171 PERMIT #: B 1912-032 <br />PROJECT: RIVERFRONT BLDG °B° INSPECTOR: Zelalem Zerihun <br />LOCATION: 3810 Riverfront Blvd, Everett, WA JURISDICTION: EVERETT <br />KA P.M.: Jeffrey S. Mercer WEATHER: Cloudy TENT: 55' F <br />A Krazan & Associates, Inc.'s representative visited AM & PM the above -said project <br />as per contractor's request and inspected CFS framing on L1. <br />CFS framed shear walls under mezzanine floor in building B were inspected for stud <br />size, gage, spacing, top & bottom tracks, fasteners, anchor bolts, hold-down, sure - <br />boards, bridges, blockings, and other parts. <br />------------------------------------------------------------------------------------------------------- <br />Most works are nearly completed per plan and minor corrections as well as other <br />work in progress items will be completed later date as discussed with the contractor. <br />------------------------------------------------------------------------------------------------------- <br />The rep also looked at ongoing non-structural CFS framing installation on Pt floor of <br />building B. CFS framings are being built as per framing detail and architectural wall <br />schedule. Work in progress. <br />Offices Serving the Western United States <br />Lynnwood (425) 485-551.9 . Poulsbo (360) 598-2126 - Tacoma (253) 939-2500 <br />The information provided on this report is prepared for the seclusive use of the client. This report may not be reproduced in any format without the written permission of the client and Kraran & Associates. This report <br />indicates our inspectors observation and testing results based on site conditions and contractor activities. This information is subject to review prior to final submittal. By signing this report, our inspector does not accept <br />responsibility for validity of results. The same information has been provided by others on site. <br />
The URL can be used to link to this page
Your browser does not support the video tag.